Strategic Policy 12
Source: Isle of Man Strategic Plan 2016
Strategic Policy 12: Favourable consideration will generally be given to proposals for improving the quality and condition of the existing housing stock and for the creation of flats by conversion of redundant boarding houses, and vacant or under-used space above commercial premises subject to compliance with detailed standards (see section 8.13).
5.1 Implementation of the Government's core purpose "to maintain and build on the high quality of life enjoyed by the Island's community" as set out in Chapter 2 requires many policy measures including, from the Department, a new Development Plan with this Strategic Plan as the over arching policy framework. To guide the physical development of the Island up to 2016 requires an Island Spatial Strategy (ISS) (1). The ISS provides a framework for strategic choices in relation to development and infrastructure investment. It will also assist private sector investment decisions. It provides a degree of continuity with existing policy but sets new directions to achieve a more sustainable pattern of development in the interests of future generations. It will also assist in the setting of priorities for future investment.
5.2 The starting point of any spatial strategy has to be a review of the existing settlement and development pattern of the Island. The very fact that we are an Island nation sets us apart from most of the regions of the British Isles which share physical boundaries with other regions and jurisdictions. The Island comprises a number of distinctive areas which have evolved from the natural landscape and the settlement of the Island. Generally, each area is based on a principal town which supports a range of employment and service provision serving a rural catchment area including smaller villages or hamlets.
5.3 The four areas are:
At the time of the 2001 Census some 23,000 (nearly 60%) of the Island's 39,000 employed population worked in Douglas. A further 2200 (5.7%) worked in Braddan and some 1400 (3.6%) in Onchan.
In 2001 nearly 2500 (6.4%) of the employed population worked in Ramsey.
In 2001 just over 1000 (2.7%) of the employed population worked in Peel.
(1) Island Spatial Strategy is defined in Appendix 1
(2) Isle of Man 2006 Census
In 2001 some 2300 (6.1%) of the employed population worked in Malew. Some 1400 (2.7%) worked in Castletown.
5.4 This area framework is supported by a strategic transport network which comprises a radial pattern of roads converging on Douglas with links between the main towns and villages around the coast.
5.5 Thus the current spatial framework is characterised by four areas each with a main centre or, in the case of the south, a series of smaller centres, with the strategic transport network providing the links between all parts of the Island. These form a family of settlements which provide a hierarchy of employment and service centres across the Island. The size of some of these settlements presents challenges in terms of maintaining the current level of services in the future. Over the years this area framework has been supported by Government in terms of public service provision of education, healthcare and leisure. Area Plans for each of the four defined areas will be prepared during the next 4 to 5 years.
5.6 The Consultation Draft (2000) introduced the concept of a new settlement as a means of accommodating new housing provision but this idea was rejected by the Department in the Draft Strategic Plan (2001) in favour of a policy of containment around existing urban areas (see Appendix 3). The Strategic Aim, Objectives and Policies provide the framework to develop the existing spatial framework into a Spatial Strategy.
5.7 The Strategic Objectives and Strategic Policies direct that the focus of new development should be within existing towns and villages or in sustainable urban extensions, avoiding coalescence of settlements and maintaining their local identity. This translates into a Spatial Vision that by 2016 the Island's communities will have become more sustainable, prosperous, safe, healthy and vibrant. People from all sections of society will have been provided with better access to a range and choice of homes, jobs and services. This will have been achieved in ways that reduce the impact of society on the environment, improve the quality of design and the built environment and enhance the Island's natural environment and heritage assets.
5.8 In order to achieve this 'Spatial Vision', a framework is required as part of the Island Spatial Strategy for the future development of the Island based on service CENTRES, key transport LINKS and the main GATEWAYS of ports and Ronaldsway Airport (see Key Diagram).
The CENTRES comprise a hierarchy of service provision with Douglas, the capital of the Island, seat of Government and headquarters for most of the Island principal businesses and retail stores, as the MAIN CENTRE. Ramsey, Peel, Onchan, Castletown and Port Erin act as SERVICE CENTRES for their respective hinterlands. Below these are a series of SERVICE VILLAGES made up of Laxey, Jurby, Andreas, Kirk Michael, St Johns, Foxdale, Port St Mary, Ballasalla and Union Mills. Finally, there are a number of smaller settlements with little or no service provision which rely on the other centres for various services.
These comprise:
Bride Glen Maye
Sulby Dalby
Ballaugh Ballafesson
Glen Mona Colby
Baldrine Ballabeg
Crosby Newtown
Glen Vine Strang
The only major employment area outside the CENTRES is that based on the Ronaldsway and Ballasalla Industrial Estates and the Freeport but these are adjacent to Ballasalla and Castletown.
The aim of the CENTRES, LINKS and GATEWAY approach is to give a strategic focus to future development and achieve balanced growth on the Island by developing:
5.9 In the Douglas and the East Area the focus of development will continue to be in and around D
21
Citations
94.4%
Approval Rate
2010
Peak Year
Castletown
Top Parish
Erection of 133 dwellings with associated drainage and access (Amendments to 19/00961/B)
Rebuilding of the rear outlet, retrospective partial demolition of the single storey extension and construction of new gable wall
Alterations to dwelling; replace garage door with wall & window, installation of replacement doors and windows. Rebuild bay window on front elevation & re rendering of the dwelling
Conversion of unused space above shop into two one bedroom flats
Change of use of first and second floor from retail to residential use with associated works
Erection of 133 dwellings with associated drainage and access
Change of use from retail to residential
Conversion of an apartment (class 3.4) into two apartments (class 3.4)
Conversion of boarding house to provide five self-contained apartments
Change of use of commercial unit to residential property