20 February 2009 · Acting Senior Planning Officer
3, Ballanard Woods, Ballanard Road, Douglas, Isle Of Man, IM2 5pq
The proposal is for a large Georgian-style dwelling on a 1-acre plot within a designated Low Density Housing in Parkland area, featuring a U-shaped courtyard with adjoining garage block for four cars, ground floor with multiple rooms opening to terraces, first floor with master and guest bedrooms accessing a terrace, a…
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The site is designated for residential development as Low Density Housing in Parkland under the Douglas North Local Plan 1998, so the principle of a dwelling accords with the land use zoning and Gener…
General Policy 2
Requires development in accordance with area plan zoning and 14 specific criteria on siting, scale, design, landscaping, amenity, access, highways, services, etc. Officer confirmed full compliance, particularly respecting site/surroundings (b), not affecting character (c), incorporating topography/trees (f), providing access/parking (h), and no unacceptable highway effects (i).
Housing Policy 6
Requires residential development on zoned land per area plan brief or para 6.2 criteria, encouraging good/innovative design without needless prescription. Site follows Douglas North Local Plan brief for Low Density Housing in Parkland.
Low Density Housing Policy
Requires substantial buildings designed/finished to highest quality, each in at least 1 acre (0.4 ha) grounds sitting comfortably/naturally in landscaped setting acknowledging contours/trees. Proposal fully accords as substantial Georgian dwelling on 1-acre plot integrating mature trees and levels.
Time limit
The development hereby permitted shall commence before the expiration of four years from the date of this notice.
Approved plans
This permission relates to the erection of a dwelling including garaging, ancillary accommodation and landscaping as shown in drawings 2328-P3-001, 2328-P3-005, 2328-P3-009, 2328-P3-010, 2328-P3-011, 2328-P3-012, 2328-P3-013, 2328-P3-014, 2328-P3-015, 2328-P3-016, 2328-P3-017, 2328-P3-018, Views and Design Statement date stamped 20th November 2008.
Materials approval
No development shall take place until samples of the facing, roofing and paving materials to be used shall have been submitted to and approved in writing by the planning authority and these works shall be carried out in accordance with the approved details. The development shall be carried out in accordance with the approved details.
Garage materials matching
Subject to condition 3, the garage block and the linking section to the main dwellinghouse must be constructed using the same facing materials as the main dwellinghouse.
Hard landscaping scheme
No development shall take place until full details of hard landscaping works have been submitted to and approved in writing by the Planning Authority and those works shall be carried out as approved. Details of hard landscaping works shall include boundary treatment, including full details of the precise location and extent of the boundary treatment; footpaths; and hard surfacing materials. The hard landscaping works shall be completed in full accordance with the approved details within 3 months of the first occupation of the dwellings hereby permitted.
Soft landscaping and tree replacement
All planting shall be carried out in accordance with the approved plans within the first planting and seeding seasons following that first occupation. Any tree or shrub which within a period of 5 years from the completion of development dies, is removed or becomes seriously damaged or diseased shall be replaced in the next planting season with another of similar size and species, unless the planning authority gives written consent to any variation.
Vehicular access prior to occupation
The dwelling hereby permitted shall not be occupied until the vehicular means of access has been constructed in accordance with the approved plans and until the section of road up to the site has been constructed under planning permission 07/01917/B. Those means of access shall thereafter be kept available at all times for their respective purpose.
Car parking and manoeuvring prior to occupation
The dwelling hereby permitted shall not be occupied until the car parking and manoeuvring areas have been provided in accordance with the approved plans, and those areas shall thereafter be kept available at all times for their respective purposes.
Tree/shrub protection
No existing tree or shrub indicated on the approved plans to be retained shall be cut down, grubbed out, topped, lopped, or uprooted without the written consent of the Planning Authority. Any such tree or shrub removed without such consent or dying, becoming seriously damaged or diseased within a period of 5 years from the completion of the development shall be replaced in the next planting season with another of similar size and species, unless the planning authority gives written consent to any variation.
Construction tree safeguards
No development or other operation shall be commenced on this site until adequate steps, which shall have been previously approved in writing by the Planning Authority, have been taken to safeguard against damage or injury during construction works of all trees on the site, or those trees whose root structure may extend within the site. In particular no excavations, site works, trenches or channels shall be cut or pipes or services laid or any other works carried out in such a way as to cause damage or injury to the trees by interference with their root structure and no soil or waste shall be deposited on the land in such a position as to be likely to cause damage or injury to the trees.
Ancillary accommodation restriction
The additional living accommodation above the garages shall only be ancillary accommodation to the main dwelling house and at no time shall form a separate dwellinghouse.
Do not oppose subject to the imposition of conditions on off-street parking per IoM Strategic Plan, turning facility for forward egress, and clear visibility splays.
No objection.
No objection subject to previously agreed drainage system, connection to public sewer, no surface water to foul drainage, and communication fee.