16 March 2006 · Director of Planning and Building Control (delegated authority under Article 3(13) of the Town and Country (Development Procedure) Order 2005)
Isle Of Man Education, Peel Clothworkers School, Derby Road, Peel, Isle Of Man, IM5 1hp
The proposal involved installing disabled access ramps around the school building, along with steps and new doors with level thresholds to comply with disability access standards. The ramps include galvanised railings and are constructed in concrete and blockwork with render finish.
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The officer noted the site is within the curtilage of Peel Clothworkers School in an area designated for education on the Peel Local Plan approved by Tynwald in 1989.
Peel Local Plan approved by Tynwald in 1989
The policy designates the site as an area of Education. The officer confirmed the site represents the curtilage of the school within this designation, making the enabling works for disabled access appropriate in principle with no policy conflict noted.
Time limit
The development hereby permitted shall commence before the expiration of four years from the date of this notice.
Approved drawings
This permission relates to the installation of disabled persons' ramps and accesses, including new doors, all as shown in drawings reference D01, D02B, D03, D04, D05 and D06 all received on 15th December, 2006.
RECOMMENDED FOR APPROVAL
no adverse views (implied no objection)