18 August 2004 · Planning Committee
Fields 521888 And 521895, Between Isle Of Man Business Park And, Cooil Road, Douglas, Isle Of Man, IM2 2qz
Dandara Commercial Ltd applied to use two fields (521888 & 521895) adjacent to Cooil Road in Braddan as a temporary builders compound until their new permanent facility near the Energy From Waste plant is ready, expected within 12 months.
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The officer recommended approval recognising the temporary 12-month need until the applicant's approved recycling compound (PA 03/01574) near the Energy From Waste Facility becomes operational.
Site and use definition
This approval relates to the temporary use of the site as defined in the location plan received on 24th June, 2004 as a builder's compound for the storage and sorting of builders' equipment and materials. The materials may only be stored in the main part of the site and not in the narrow part of the site (field 521888) which extends to Ballacottier Cottage.
Time limit and user restriction
The site may be used as above by Dandara Commercial Ltd and their associated companies only and for a period ending on 31st August, 2005 or on completion of the new compound adjacent to the Energy From Waste Facility, whichever is the sooner.
No waste storage
There may be no inert material or waste brought to or stored on the site. Note: this is in order to prevent dust emanating from the site alongside what is a Principal Traffic Route and alongside which developments of quality are being encouraged.
Landscaping scheme
The applicant must, within 28 days of the date of this notice submit a detailed landscaping scheme which will introduce additional planting to reinforce the existing roadside vegetation using species complementary to the planting which will be introduced at the entrance to The Barley Field industrial development. Such planting once approved must be introduced prior to November, 2004.
Height limit
No material or equipment may be stored at a height exceeding 4m as measured from natural ground level.
Recommend approval, subject to conditions
Recommend approval subject to 12-month limit and 10m landscaping belt