23 March 2011 · Director of Planning and Building Control (delegated authority under Article 3(13) of the Town and Country (Development Procedure) Order 2005); Decision Notice issued by Mrs C Dudley, Deputy Secretary
Fields 521888 And 521895, Between Isle Of Man Business Park And, Cooil Road, Douglas, Isle Of Man, IM2 2qz
The proposal involves constructing a modern three-storey office building providing approximately 945 square metres of net office floorspace for use as corporate headquarters on a 0.41 hectare undeveloped site within the established Isle of Man Business Park.
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The proposed development accords with the land use designation for business park development under the extant 1991 Braddan Parish District Local Plan and Business Policy 7 of the Isle of Man Strategic…
General Policy 2
Requires development in accordance with land-use zoning and Area Plan proposals, respecting site/surroundings in siting/layout/scale/design/landscaping, without adverse impacts on amenity, highways, habitats, or services. Officer assessed the proposal as compliant given its business park location, similar design to adjoining approvals, acceptable amenity/highway impacts, and inclusion of landscaping.
Business Policy 7
Permits new office floorspace exceptionally on approved Business Parks for Corporate Headquarters without day-to-day callers. Officer confirmed acceptability in principle as the building is for corporate headquarters by a specific end-user not attracting public visitors, aligning with the site's zoning.
Business Policy 8
Requires new office buildings to respect scale/character of adjoining buildings and provide parking per Appendix 7 standards. Proposal's three-storey height and modern design match adjoining approvals; 63 spaces exceed the 1:15 sqm requirement.
Transport Policy 7
Requires parking in accordance with current standards (Appendix 7: 1 space per 15 sqm net office floorspace). Proposal provides 24+ spaces against minimum 20, deemed satisfactory.
Transport Policy 8
Requires Transport Assessment for major developments. Accompanied by assessment confirming no detriment to road safety/convenience.
Environment Policy 5 - Mitigation against damage to or loss of habitats
Requires Energy Impact Assessment for developments over 100 sqm. Submitted assessment considered acceptable, meeting policy requirements with measures like low-E windows, exceeding insulation standards, and energy-efficient lighting.
Time limit
The development hereby permitted shall commence before the expiration of four years from the date of this notice.
Approved drawings
This approval relates to drawing no.s APL/01 rev. A, APL/04 rev. A, APL/05 rev. A and APL/06 rev. A date stamped the 10th February 2011.
Car parking provision
Prior to the occupation of the building the car parking provision must be set out and capable of use in accordance with drawing no. APL/01 rev. A date stamped the 10th February 2011.
Do not oppose; level of development will not have adverse impact on traffic volumes or safety; no objection
No Objection in Principle subject to connection to public sewer, percolation test for soakaways, no groundwater to foul sewer, and pre-commencement agreement
The Commissioners had no objection