Agricultural Building Proposal Letter
Planning Dept
Murray House
Mount Havelock
20 April 2014
Application - Mr P & Mrs A Letch
Erection of Agricultural Building to provide stables & equestrian training arena & construction of 2 banks @ Praslin, Grenaby Road, Ballabeg IM9 4HD
Existing access from Grenaby Road to gate @ post X, West corner or field. New track from gate @ post X to SW and along SE elevation. Parking for staff member & horse trailer alongside entrance as shown.
New banks as shown 1.00 > 1.2 m high for landscaping & wind protection. NW (rear) portion dug into slope, with spoil dragged to form base for SE portion, track to SE and new banks to SE and NE.
Materials -
Side elevations SE & NW - green coated corrugated sheeting. Gable walls SW & NE - green painted blockwork, green sheeting over up to apex. Roof - 80 % green coated, 20 % clear corrugated sheeting. Rainwater discharged to exiting ditch.
Days of operation - arena aprox 240 days p/a. Stables aprox 300 days p/a.
Hours of operation -
arena 1.00pm > 4.00pm, stables 8.00am >10.00am & 5.00pm > 7.00pm. Staff - 1 employee, 2 family members.