Environment Policy 10
Source: Isle of Man Strategic Plan 2016
Environment Policy 10: Where development is proposed on any site where in the opinion of the Department of Local Government and the Environment there is a potential risk of flooding, a flood risk assessment and details of proposed mitigation measures must accompany any application for planning permission. The requirements for a flood risk assessment are set out in Appendix 4.
261
Citations
90.1%
Approval Rate
2023
Peak Year
Douglas
Top Parish
Form new entrance lobby under existing shopfront canopy
Front extension to existing attached garage
Removal of existing door on front elevation with blocking up of aperture
Conversion of funeral directors and workshop into dwellinghouse (in association with 25/00246/CON)
Construction of car parking area for 30 cars
Creation of wildlife ponds/dubs (retrospective)
Single storey extension to the rear of the dwelling and internal alterations
Additional use of residential dwelling as tourist accommodation (Class 3.6)
Alterations to No. 4 and 5 Marine Gardens and Queens Gardens including the installation of seating, disabled access, installation of playground equipment, outdoor shower facility, and planting and landscaping
Installation of a flue