Loading document...
==== PAGE 1 ====
Penketh - Millar 23 West Quay Ramsey Isle Of Man IM8 1DL TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure) Order 2019 In pursuance of powers granted under the above Act and Order the Department of Environment, Food and Agriculture determined to APPROVE an application by Mr James Holmshaw, Ref 22/00781/B, for the Erection of a detached dwelling at Plot 1 Field Adjcent To Beechfield Glen Auldyn Ramsey Isle Of Man Any conditions or notes which apply to the approval are set out below. This approval is subject to compliance with any conditions listed and may not be implemented until it becomes final (see guidance notes). 1. The development hereby approved shall be begun before the expiration of four years from the date of this decision notice. Reason: To comply with Article 26 of the Town and Country Planning (Development Procedure) Order 2019 and to avoid the accumulation of unimplemented planning approvals. 2. Prior to any construction of the dwelling hereby approved in relation to Plot 1, the access shown on Penketh Millar drawing no 15 1146 6 date stamped 02/10/17 (under PA 16/00650/B) shall be constructed as shown and the visibility splays shall remain unobstructed at a height of 1.05m thereafter. Reason: In the interests of highway safety. 3. Notwithstanding the provisions of the Town and Country Planning (Permitted Development) Order 2012 (or any Order revoking and/or re-enacting that Order with or without modification), no development shall be undertaken under the following classes of Schedule 1 of the Order at any time: Class 14 - Extension of dwellinghouse Class 15 - Garden sheds and summer-houses Class 16 - Fences, walls and gates Class 17 - Private garages and car ports Reason: To control future development on the site. Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950
==== PAGE 2 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 4. Within one month of the construction of the new access (as per the requirements of Condition 2) the existing field access shall be blocked up with a grass bank with hedgerow planting, of which details must be included within submitted landscaping details required under condition 3) above, to match the existing roadside hedgerow and retained thereafter. Reason: In the interests of the character and appearance of the site and surrounding area. 5. The development hereby approved shall not be occupied or operated until the parking and turning areas have been provided in accordance with the approved plans. Such areas shall not be used for any purpose other than the parking associated with the development and shall remain free of obstruction for such use at all times. Reason: To ensure that sufficient provision is made for off-street parking in the interests of highway safety. 6. Notwithstanding the details that have been submitted, a detailed landscaping strategy shall be submitted to the Department in writing to be agreed within three months of this approval. The landscape strategy shall include details of hard surfacing materials, planting plans (at a scale not less than 1:100), written specification of planting and cultivation works to be undertaken and schedules of plants (no non-native species), noting species, plant sizes and proposed numbers / densities and a programme for the implementation, completion and subsequent management of the proposed landscaping. Any proposed planting should be in accordance with details contained within a Planting Palette provided as part of the Strategy. The hard surfacing details shall include details of planters and samples showing the texture and colour of the materials to be used. The development shall be carried out in accordance with the approved scheme and shall be retained as such thereafter. Reason: To ensure that the development achieves a high standard of design, layout and amenity and makes provision for hard and soft landscaping which contributes to the creation of a high quality environment. 7. Prior to the installation of external finishes and materials, a schedule of materials and finishes and samples of the materials to be used in the construction of the external surfaces, including roofs, shall be submitted to and approved in writing by the Department. The development shall not be carried out unless in accordance with the approved details and retained thereafter. Reason: In the interests of the character and appearance of the site and surrounding area. This approval relates to the documents and plans submitted 24 June 2022, and the Agents Correspondence received 18 August 2022. This decision has been made for the following reasons(s) It is considered that the planning application is in accordance with General Policy 2, Housing Policy 6, and Transport Policies 4 and 7 of the Isle of Man Strategic Plan 2016, the 1982 Development Plan, and the relevant sections of the Residential Design Guide 2019.
==== PAGE 3 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 21st December 2022 Director of Planning and Building Control
==== PAGE 4 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Guidance Note This decision was made by the Planning Committee in accordance with the authority delegated to it. This decision refers only to that applied for under the Town and Country Planning Act 1999 and its subordinate legislation. A copy of the Officer’s report and any correspondence which led to the assessment and decision is available to view on the Government’s website (via Online Services www.gov.im/Viewapplications) or at the Department’s offices Murray House, Mount Havelock, Douglas. Implementation The decision does not become final until either Any appeal has been concluded; or 21 days have passed since the date on this notice and no appeal has been submitted Development must progress in accordance with the plans approved under, and any conditions attached to this approval (irrespective of any changes that may separately be requested at the Building Control stage or by any other Statutory Authority). This approval does not remove the need to also comply with any other relevant legislation. Any conditions requiring certain works, submissions etc. prior to commencement of development must be fulfilled prior to work starting on site. Failure to adhere to this approval and meet the requirements of all conditions may invalidate this approval or result in formal enforcement action. Appeal Any appeal must be in writing and submitted to the Department within 21 days of the date of this Notice. The appeal must contain: the grounds for making the appeal; payment of the planning appeal fee (currently £305); and if relevant, confirmation that the appellant wishes to have the appeal determined by means of an inquiry and payment of the additional inquiry fee (currently £115). Where the appeal is submitted by the applicant they must: specify in detail and by reference to material planning considerations the reasons why the appellant disagrees with that determination; and Where against a refusal, on the grounds of deficient detail or supporting documentation, set out why they consider the information or documentation forming part of the application was sufficient in the circumstance. If the appeal is submitted by someone who has interested Person Status but is not listed in Article 4(2) of the Development Procedure Order 2019, that person must relate their grounds for making the appeal to issues which they included in representations made prior to the application being determined. Failure to meet all of the relevant above requirements will mean that the appeal cannot be validated. An appeal form and more detailed guidance are available either from Planning & Building Control, Tel 685950, or from the Department’s website www.gov.im/planningappeal If this decision becomes final because there is no appeal, the Department’s public reference copy (counter copy) of the planning application may be collected by the applicant or their agent from Murray House. Please note that if the counter copy of the application is not collected within thirty days following the last date on which a planning appeal can be made it will be destroyed without further notice.
Copyright in submitted documents remains with their authors. Request removal