21 December 2022 · Planning Committee
Field Adjcent To Beechfield, Track From Glen Auldyn, Glen Auldyn, Ramsey, Isle Of Man, IM7 2ad
This is an application to amend the design of a detached dwelling already approved on Plot 1 in a field adjacent to Beechfield, Glen Auldyn, Ramsey. The changes include enlarging a rear outlet, adding a new guest bedroom suite projecting 4.8m from the rear (adding 30.24sqm floor area), converting a garden room to an en…
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The officer assessed the amendments against the principle established by prior approval under PA 16/00650/B, noting 'the circumstances which warranted the approval of the dwelling on the site has not …
General Policy 2
Requires development to respect site/surroundings in siting/layout/scale/design/landscaping, not harm landscape/townscape/amenity/highway safety, incorporate topography/landscape features, and provide access/parking. Officer found amendments acceptable as they do not alter prior approval's compliance, with no height increase, appropriate finishes, and retained access/parking.
Housing Policy 6
Requires residential development in zoned areas to follow area plan briefs or criteria in para 6.2, encouraging good design. Site zoned 'Proposed - Low Density Housing in Parkland' under 1982 Plan; amendments' design/size/proportion/form/finishes appropriate for site/area with no adverse visual impacts.
Transport Policy 4
Highways serving development must accommodate generated traffic safely. No access changes; DOI Highways confirmed no highway safety/parking impact.
Transport Policy 7
Requires parking per standards. Parking unchanged from approved scheme, considered acceptable.
Time limit
The development hereby approved shall be begun before the expiration of four years from the date of this decision notice. Reason: To comply with Article 26 of the Town and Country Planning (Development Procedure) Order 2019 and to avoid the accumulation of unimplemented planning approvals.
Access construction and visibility splays
Prior to any construction of the dwelling hereby approved in relation to Plot 1, the access shown on Penketh Millar drawing no 15 1146 6 date stamped 02/10/17 (under PA 16/00650/B) shall be constructed as shown and the visibility splays shall remain unobstructed at a height of 1.05m thereafter. Reason: In the interests of highway safety.
Restricted permitted development
Notwithstanding the provisions of the Town and Country Planning (Permitted Development) Order 2012 (or any Order revoking and/or re-enacting that Order with or without modification), no development shall be undertaken under the following classes of Schedule 1 of the Order at any time: Class 14 - Extension of dwellinghouse; Class 15 - Garden sheds and summer-houses; Class 16 - Fences, walls and gates; Class 17 - Private garages and car ports. Reason: To control future development on the site.
Block existing field access
Within one month of the construction of the new access (as per the requirements of Condition 2) the existing field access shall be blocked up with a grass bank with hedgerow planting, of which details must be included within submitted landscaping details required under condition 3) above, to match the existing roadside hedgerow and retained thereafter. Reason: In the interests of the character and appearance of the site and surrounding area.
Parking and turning areas
The development hereby approved shall not be occupied or operated until the parking and turning areas have been provided in accordance with the approved plans. Such areas shall not be used for any purpose other than the parking associated with the development and shall remain free of obstruction for such use at all times. Reason: To ensure that sufficient provision is made for off-street parking in the interests of highway safety.
Landscaping strategy
Notwithstanding the details that have been submitted, a detailed landscaping strategy shall be submitted to the Department in writing to be agreed within three months of this approval. The landscape strategy shall include details of hard surfacing materials, planting plans (at a scale not less than 1:100), written specification of planting and cultivation works to be undertaken and schedules of plants (no non-native species), noting species, plant sizes and proposed numbers / densities and a programme for the implementation, completion and subsequent management of the proposed landscaping. Any proposed planting should be in accordance with details contained within a Planting Palette provided as part of the Strategy. The hard surfacing details shall include details of planters and samples showing the texture and colour of the materials to be used. The development shall be carried out in accordance with the approved scheme and shall be retained as such thereafter. Reason: To ensure that the development achieves a high standard of design, layout and amenity and makes provision for hard and soft landscaping which contributes to the creation of a high quality environment.
Materials approval
Prior to the installation of external finishes and materials, a schedule of materials and finishes and samples of the materials to be used in the construction of the external surfaces, including roofs, shall be submitted to and approved in writing by the Department. The development shall not be carried out unless in accordance with the approved details and retained thereafter. Reason: In the interests of the character and appearance of the site and surrounding area.
Do not oppose. No significant negative impact upon highway safety, network functionality and/or parking
Highway Services Division has no objection to the application. Lezayre Parish Commissioners initially refused unanimously due to design and access concerns but maintained their refusal position after clarifications, while DOI Highways Drainage requests additional drainage information.
Key concern: insufficient information relating to the drainage of surface water on this site along the access road
Lezayre Parish Commissioners
ObjectionRefused Unanimous; The proposed property is not in keeping with the surrounding properties; Their position regarding the application remains as stated. Refused Unanimous
Highway Services Division
No ObjectionAfter reviewing this Application, Highway Services HDC finds it to have no significant negative impact upon highway safety, network functionality and /or parking.
Lezayre Parish Commissioners
ObjectionTheir position regarding the application remains as stated. Refused Unanimous
DOI Highways Drainage
Conditional No ObjectionThere is insufficient information relating to the drainage of surface water on this site along the access road which should be excluded from draining onto the footpath or highway
Conditions requested: Please provide additional information to demonstrate surface water runoff will not drain onto the public highway