Application No.: 21/01551/B Applicant: Mr Adam Young Proposal: Installation of 3 tanks for the storage of chemical, Yara Nutriox. Site Address: Meary Veg Sewage Treatment Works Balnahowe Santon Isle Of Man IM4 1HL Planning Officer: Mrs Vanessa Porter Expected Decision Level: Planning Committee Recommended Decision: Permitted Date of Recommendation: 16.05.2022
C : Conditions for approval N : Notes attached to conditions C 1. The development hereby approved shall be begun before the expiration of four years from the date of this decision notice.
Reason: To comply with Article 26 of the Town and Country Planning (Development Procedure) Order 2019 and to avoid the accumulation of unimplemented planning approvals.
This application has been recommended for approval for the following reason. The proposal complies with Environment Policy 22 and 24 of the Isle of Man Strategic Plan 2016 and is recommended for approval.
Plans/Drawings/Information; This decision relates to the following plans and drawings, date stamped received on 20th December 2021;
This decision also relates to the Nutriox Storage Risk Assessment received on the 6th May 2022. _______________________________________________________________
Additional Persons
None _____________________________________________________________________________
THE APPLICATION IS BEFORE THE PLANNING COMMITTEE AS IT MAY BE CONSIDERED CONTRARY TO THE DEVELOPMENT PLAN AND IS RECOMMENDED FOR APPROVAL.
1.1 The application site is within the curtilage of Meary Veg Sewerage Treatment Works, which is situated in Santon. The site comprises the sewage treatment works which are a collection of agricultural-style clad large span buildings, silo-like structures and surface level tanks, associated offices within converted farm buildings and electricity substations, The site is around 430m in length at its longest point and 234m wide. - 1.2 The specific site is situated to the South of the Meary Veg Sewerage Treatment Works between an old drier building and the Technicians workshop. The site used to house 3 diesel storage containers of similar sizing to what is proposed within this application. The previous storage were decommissioned and removed approximately 4 years ago. THE PROPOSAL
2.1 The current planning application seeks approval for the installation of 3 GRP tanks within an existing bund for the storage of Yara Nutriox, which is used in the sewer maintenance to prevent the formation of hydrogen sulphide. - 2.2 The tanks are to measure 3.05m across with a height of 4.34m, which will have a capacity of 30 cubic metres each. The proposed existing bund can carry approximately 52 cubic meters. - 2.3 For information Yara Nutriox is a chemical which is liquid and is composed of Calcium Nitrate Tetrahydrate and water, the MUA use this chemical within their pumping stations to maintain safe levels of Hydrogen Sulphite within the sewerage infrastructure. PLANNING HISTORY
3.1 The sewage treatment facilities were initially approved under PA 99/0845. Subsequent to this, applications have been submitted and approved for the installation of a mezzanine floor and staircase to an existing tractor store (PA 05/0510), installation of an additional cake silo (PA 01/0208), the construction of a concrete base as a foundation for the installation of an oil;/water separation unit (PA 07/0593) and the increase in the height of an existing storage silo (PA 07/1504), erection of a sludge treatment building facility (13/91000/B and 14/00578/B), erection of a detached substation (15/00200/B) and most recently the refurbishment of redundant sludge processing buildings to provide storage, archive and workshop space (18/01175/B). PLANNING POLICY - 4.1 The site lies within an area zoned as "not designated for development" and also within an "Area of Ecological Importance - Draft" on the Area Plan for the East. The site is not within a Conservation Area and whilst parts of Meary Veg are within a Flood Risk Zone, the site itself is not.
harm the environment and Environment Policy 24 (EIA) in connection with Appendix 5 which seeks that Development that is likely to have a significant effect on the environment will be accompanied by either a EIA or by suitable supporting environmental information.
REPRESENTATIONS
5.1 The following representations can be found in full online, below is a short summery;
5.2 Highway Services have considered the proposal and state "No Highways Interest." (20.01.22 & 11.05.22) - 5.3 Santon Commissioners have considered the proposal and whilst they have no objection to the proposal they are worried with the amount capacity that the proposal has and suggest that the height of the bunded wall be increased. (18.02.22) - 5.4 Environmental Protection Officer had written in to state that, the proposal would not impact the current discharge license conditions and that a review of the bund is advisable to ensure it has sufficient capacity. (09.05.22). - 5.5 After a request for clarification the Ecosystem Policy Officer has written in to state that they do not think that the proposal will have an impact upon the remaining habitat. (10.05.22)
6.1 The main issues to consider in the assessment of this planning application are:
7.1 The proposed tanks are to be situated within a site which is already being used as a Sewerage Treatment works and as such an EIA is not required for the reasoning's above and the proposed works are deemed to comply with Environment Policy 22 & 24. INTERESTED PERSON STATUS - 8.1 By virtue of the Town and Country Planning (Development Procedure) Order 2019, the following persons are automatically interested persons:
I confirm that this decision has been made by the Planning Committee in accordance with the authority afforded to that body by the appropriate DEFA Delegation and that in making this decision the Committee has agreed the recommendation in relation to who should be afforded Interested Person Status.
Decision Made : Permitted Committee Meeting Date: 23.05.2022
Signed : V PORTER Presenting Officer
Further to the decision of the Committee an additional report/condition reason was required (included as supplemental paragraph to the officer report).
Signatory to delete as appropriate YES/NO See below
Customer note This copy of the officer report reflects the content of the file copy and has been produced in this form for the benefit of our online services/customers and archive records.
Copyright in submitted documents remains with their authors. Request removal
View as Markdown