18 April 2007 · Planning Committee
Douglas Harbour Bounded By North Quay South Quay Battery Pier And, Victoria Pier, Douglas, Isle Of Man, IM1 5bt
Harbours Division proposed dredging 1500 sq m to 1.5m depth, installing a 12m x 5m floating pontoon fixed by steel piles, a 32.5m gangway, and glazed walkway in Douglas Harbour between Victoria and Edward Piers.
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The officer noted that existing pier steps are unsuitable for embarking/disembarking passengers at any tide state, and cruise ships cannot currently use tenders at low tide.
Time limit
The development hereby permitted shall commence before the expiration of four years from the date of this notice.
Approved plans
This permission relates to the creation of a cruise ship tender pontoon berth as shown in drawing numbers 102, 103 and 107 date stamped 7th February 2007, Statement of Case from Design Services Division of Department of Transport dated January 2007.
Do not oppose
No objection