17 August 2006 · Delegated - Director of Planning and Building Control (M. I. McCauley)
Tamarisk, Main Road, Kirk Michael, Isle Of Man, IM6 1aj
The proposal involves extending the existing storm porch on the front of a detached dwelling known as Tamarisk, located on Main Road in the residential area of Kirk Michael. The officer assessed the development as very modest, domestic in scale, and in keeping with the character of the dwelling.
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The officer considered the application site to be the curtilage of a detached dwelling in a predominantly residential area under the Kirk Michael Local Plan, with no relevant policies identified for a…
Time limit
The development hereby permitted shall commence before the expiration of four years from the date of this notice.
Approved plans
This approval relates to the location plan and drawing no EM/1/06 date stamped the 1st June 2006.
Surface water drainage
There must be no discharge of surface water to the main foul sewer.
no objection
no objection in principle subject to no discharge of surface water to foul drainage system
request that informative note be attached regarding contact for electrical supply
Manx Electricity Authority, Drainage Division, and Michael Commissioners all responded with no objection to the storm porch extension at Tamarisk, Main Road, Kirk Michael.
Key concern: Underground Cables/Overhead Lines present in the area
Manx Electricity Authority
Conditional No ObjectionThere are Underground Cables/Overhead Lines present in the area indicated in you Planning Application. Please contact Anthony Kinrade or Ian Horsey...
Conditions requested: Applicant must contact Anthony Kinrade or Ian Horsey, Operations and Maintenance Dept, Network Services, Manx Electricity Authority, (Tel. 687705) to discuss working practices around Cables and Overhead Lines which may be required to be diverted before any work can be carried out on site; Contact the M.E.A. for Electrical Site Safety 5 documents, (Tel. 687766), before any work is carried out on site; All work to be carried out with reference to Health and Safety Executive Guidance Notes HS(G)47 & GS6
Drainage Division, Department of Transport
Conditional No ObjectionNO OBJECTION In principle subject to: -; to comply with the requirements of the Department of Transport Drainage Division and the Sewerage Act 1999.
Conditions requested: There must be NO discharge of surface water (including that from roofs and paved areas) from this proposed development to any foul drainage system(s); If this “existing drainage” discharges (directly or indirectly) to the foul sewerage system then it should be noted that an alternative means of surface water disposal must be provided; The applicant is required to establish where the existing surface water from the property is disposed and discuss this matter with the Drainage Division prior to work commencing on site; The applicant is requested to supply the Division a copy of any Building Control Application in relation to the surface water discharge from this development
Michael Commissioners
No ObjectionNO OBJECTION