Loading document...
==== PAGE 1 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Island Catering & Heating Engineers Ltd Mr W Sherburn 100 Magnerosen Port Erin Isle Of Man TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure)(No 2) Order 2013 In pursuance of powers granted under the above Act and Order the Department of Environment, Food and Agriculture determined to APPROVE an application by Mr Geoffrey Tang, Ref 17/01307/B, for the Installation of an extractor system (retrospective) at 16 Michael Street Peel Isle Of Man IM5 1HB. Any conditions or notes which apply to the approval are set out below. This approval is subject to compliance with any conditions listed and may not be implemented until it becomes final (see guidance notes). This approval relates to site location plan and 4 x site photographs all date stamped and received 20/12/2017 and an email from the agent also dated 20th December 2017. This decision has been made for the following reasons(s) While generally this type of development is not sought in Conservation Areas, the location of this flue benefits from being enclosed with a rear area of the buildings and not visible from any public thoroughfare. As such, the external flue is not considered to impact upon the character and quality of Peel Conservation Area. Given the standard of flue installed it is not likely that the proposal will result in significant harm on the neighbouring amenity to warrant a refusal. It could be noted that if at any time any harm does arise relative to noise and smells that this could be an issue raised with Environmental Health for further investigation and consideration. For these reasons the proposal is considered to comply with the provisions set out in General Policy 2 (b), (c) and (g), Environment Policy 22 and Environment Policy 35 of the Isle of Man Strategic Plan 2016 and as such is recommended for approval. Date of Issue: 29th March 2022 Director of Planning and Building Control
==== PAGE 2 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Guidance Note This decision was made by a Principal Planner in accordance with the authority delegated to them. This decision refers only to that applied for under the Town and Country Planning Act 1999 and its subordinate legislation. A copy of the Officer’s report and any correspondence which led to the assessment and decision is available to view on the Government’s website (via Online Services www.gov.im/Viewapplications) or at the Department’s offices Murray House, Mount Havelock, Douglas. Implementation The decision does not become final until either · Any appeal has been concluded; or · 21 days have passed since the date on this notice and no appeal has been submitted Development must progress in accordance with the plans approved under, and any conditions attached to this approval (irrespective of any changes that may separately be requested at the Building Control stage or by any other Statutory Authority). This approval does not remove the need to also comply with any other relevant legislation. Any conditions requiring certain works, submissions etc. prior to commencement of development must be fulfilled prior to work starting on site. Failure to adhere to this approval and meet the requirements of all conditions may invalidate this approval or result in formal enforcement action. Appeal Any appeal must be in writing and submitted to the Department within 21 days of the date of this Notice. The appeal must contain: · the grounds for making the appeal; · payment of the planning appeal fee (currently £295); and · election to have the appeal conducted by means of an inquiry(a hearing) or by means of written representation. Failure to meet all of the relevant above requirements will mean that the appeal cannot be validated. An appeal form and more detailed guidance are available either from Planning & Building Control, Tel 685950, or from the Department’s website www.gov.im/planningappeal If this decision becomes final because there is no appeal, the Department’s public reference copy (counter copy) of the planning application may be collected by the applicant or their agent from Murray House. Please note that if the counter copy of the application is not collected within thirty days following the last date on which a planning appeal can be made it will be destroyed without further notice.
Copyright in submitted documents remains with their authors. Request removal