15 May 2006 · Director of Planning and Building Control (M. I. McCauley)
Island Timber & Building Ltd, Port Way, Balthane Industrial Estate, Ballasalla, Isle Of Man, IM9 2al
The proposal involved erecting a single industrial warehouse unit measuring 10m wide, 22.5m long and 6.25m tall to the ridge, finished in blue profiled sheeting to match surrounding buildings within the Balthane Industrial Estate. The site is designated as industrial under the 1982 Development Plan.
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The officer assessed that the proposal complies with the industrial land use designation on the site within Balthane Industrial Estate under the Isle of Man Planning Scheme (Development Plan) Order 19…
Multiple consultees responded to planning application 05/92252/B for a warehouse at Balthane Industrial Estate, with DOT Highways initially objecting but later withdrawing subject to parking conditions, DOT Drainage initially deferring but ultimately no objection with conditions …
Key concern: insufficient details of parking and access (highways objection, later withdrawn)
IoMWA
Conditional No ObjectionThe Authority wish to express their interest in the following planning applications, and request that a condition of planning be that the applicant must contact the Authority to ensure that a connection is obtained for water supply purposes
Conditions requested: a condition of planning be that the applicant must contact the Authority to ensure that a connection is obtained for water supply purposes, or an amendment to the existing supply under the terms of the Water Supply Byelaws
Department of Transport Drainage Division
Conditional No ObjectionNo Objection In principle subject to:; the Drainage Division of the Department of Transport will relax its normal 3m clearance from any structure to a public sewer down to 2m in this instance, providing that the foundations of the unit are taken below the invert level of the public sewer
Conditions requested: There must be NO discharge of surface water (directly or indirectly) from this proposed development to any foul drainage system(s); A communication fee will be payable to the Department of Transport in respect of this surface water drainage connection; No connection is to be made from this proposed unit the public surface water sewer upstream of the development has been upgraded by the Department of Transport Drainage Division; The sewer must be fully protected whilst all building works are being carried out. No part of the proposed development may be constructed, nor any trees planted, within two metres of any public sewer either at the time of construction or at any time in the future; No approval is given by the Department of Transports Drainage Division for any foul sewer connection from this unit. If any foul connection is required to be made at the time of construction or any time in the future full written permission must be obtained from the Department of Transport Drainage Division; the foundations of the unit are taken below the invert level of the public sewer
Department of Transport Highways Division
ObjectionObjection: There are no/insufficient details given of parking and access requirements to evaluate the application.
Department of Transport Highways Division
Conditional No ObjectionThe Department of Transport Highway Division will withdraw its objection subject to the imposition of the following condition Two off street parking spaces are provided to serve the existing and future needs of this development.
Conditions requested: Two off street parking spaces are provided to serve the existing and future needs of this development
Malew Parish Commissioners
No ObjectionThe Commissioners wish to notify you that they no objection to these amended plans.
Malew Parish Commissioners
No ObjectionThe Commissioners wish to notify you that they do not object to this Planning Application