05/00458/B Planning Approval Notice May 2005
Town and Country Planning Acts, 1934 - 1991
Isle of Man Planning Scheme (Development Plan) Order 1982
M P Associates Ltd Salisbury House Victoria Street Douglas IM1 2LW
In pursuance of powers granted under the above Acts and Order the Department of Local Government and the Environment does hereby APPROVE the following application made on behalf of:
Name: Raven Hill Resources Ltd Proposal: Erection of a dwelling to plot 20 of approved residential estate (02/0712/B), at: Poachers Pocket Bridge Road Ballasalla IM9 3DA
which was considered on 12 May 2005, subject to compliance with the conditions specified below.
Date of Issue: 24 May, 2005 Murray House Mount Havelock Douglas Signature: [Handwritten signature] Secretary Planning Committee
Schedule Of Conditions:
- The development hereby permitted shall commence before the expiration of four years from the date of this notice.
- This approval relates to the erection of a dwelling as shown in drawing 0210/PL1020 received on 9th March, 2005.
- The proposed development must be connected to the proposed sewers approved under PA 02/0712 and in a manner acceptable to the Department of Transport’s Drainage Division and on terms and conditions which must be agreed with the Division PRIOR to the commencement of any building works (in particular the Drainage Division must be advised of the commencement of work on site. All drainage works must conform to the requirements of the WRc’s “Sewers for
Adoption" [5th Edition] and all necessary inspections/surveys [including CCTV] are to be carried out at the developer's expense. It is also a legal requirement under the Sewerage Act 1999 that the Department of Transport (as the Drainage Authority) be advised in advance, of the date of connection of each dwelling to the public sewer.
Note: Communication fees will be payable to the Department of Transport in respect of these drainage connection(s).
Note: The Drainage Division requires "as built" drawings of the development once it has been completed.
- There must be no discharge of surface water to the main foul sewer.
- The proposed diversion of the existing public sewers which cross the site, must be carried out in terms and conditions which must be agreed with the Drainage Division prior to the commencement of any works. All drainage works must conform to the requirements of the WRC's "Sewers for Adoption" [5th Edition] and all necessary inspections/surveys [including CCTV] are to be carried out at the developer's expense. The Drainage Division must be given three days' notice before such an inspection is carried out.
- No development, including site clearance shall take place in pursuance of the consent hereby granted until such times as the main river designation of the Silverburn River pursuant to the provisions of the Land Drainage Acts has been extended to incorporate the flood alleviation and mitigation measures shown on the URS Drawings 47445-006-787 Figures 5, 6, 7, 8 and 11 (submitted in respect of PA 02/0712) to the satisfaction of the Planning Authority in consultation with the Department of Transport.
- Following the clearance of the site and prior to the commencement of any building works, the bund, flood protection and flood alleviation and mitigation measures specified in conditions 2 and 6 (of PA 02/0712) must be constructed on site to the satisfaction of the Planning Authority.
- No other work shall be commenced on site until the estate road junction with the A7 adopted highway, including visibility splays where required, has been set out and established to the satisfaction of the Planning Authority after consultation with the Highway Authority.
- The dwelling hereby approved may not be occupied until the estate road has been constructed to at least base course level, adequately lit from the junction of the A7 adopted highway up to the access to the dwelling to the satisfaction of the Planning Authority after consultation with the Highway Authority.
- Prior to the occupation of the dwelling hereby approved, the proposed parking facilities associated with the dwelling must be provided in accordance with the approved drawing to the satisfaction of the Planning Authority and so shall thereafter be retained.
- No works may commence upon the penultimate dwelling on the site until the estate road has been completed to the satisfaction of the Planning Authority after consultation with the Highway Authority.
- Notwithstanding the provisions of the Town and Country Planning (Permitted Development) Order 1982 (or any Order revoking or re-enacting that Order) no greenhouses, walls, gates, fences, garden sheds, garages or tanks for the storage of oil for domestic heating shall be erected (other than those expressly authorised by this approval) without the prior written permission of the Planning Authority.
- Prior to the commencement of works on site, including site clearance, those existing trees on site whose removal was not authorised by the approval granted in respect of PA 02/0712, must be adequately protected against damage during the course of construction, in accordance with the recommendations contained in BS 5837 (Section 8). The area between the trunk of each tree and the fencing shall thereafter be referred to as the Protected Area. After the completion of the development works, the Protected Area must remain free from excavation or the deposit of materials.
- The Manx Museum and National Trust must be informed of the date when building work is to commence and be given access at all reasonable times, and reasonable opportunity to inspect the site, observe all excavations and investigate any archaeological features exposed.
- No development may commence until there has been approved by the Planning Authority a scheme of landscaping which includes an indication of all existing trees and hedges within the site and details of any to be retained together with measures for their protection during the course of construction.
- All planting, seeding or turfing comprised in the approved details of landscaping must be carried out in the first planting and seeding seasons following the completion of the development or the occupation of the dwellings, whichever is the sooner. Any trees or plants which within a period of five years from the completion of the development die, are removed, or become seriously damaged or diseased must be replaced in the next planting season with others of a similar size and species.
- Prior to the commencement of any building works, the applicant/developer shall convene a site meeting with the contractor and relevant officers of the Department of Local Government and the Environment and other Government Departments to agree how the works are to be undertaken in accordance with the approved plans and conditions.
- Prior to the commencement of any building works, further details including where appropriate, the precise location, construction, elevation and cross sectional details of the proposed flood protection bund and wall and surface water attenuation tank must be submitted to and approved by the Planning Authority.
- No development associated with the proposed dwelling (including guttering and foundations) may be carried out, on, over or under land which is not part of the defined site.
NOTE Prior to the commencement of building works, the applicant is advised to consult with the Access Officer of the Manx Foundation for the Physically Disabled (telephone 619937).
NOTE The Chief Fire Officer recommends the installation of mains wired interconnected domestic smoke detection.
This decision was made by the Planning Committee constituted in accordance with Paragraph 2 of Schedule 1 of the Isle of Man Planning Scheme (Development Plan) Order 1982.
Note 1: This permission refers only to that required under the Town and Country Planning Acts and does not include any consent or approval under any other enactment, bylaw, order or regulation.
Note 2: No works may be commenced until such time as -
- the time for requesting a review of the initial decision has expired; or
- any review of the initial decision has been completed; or
- the time for requesting an appeal in relation to the decision has expired; or
- any appeal has been completed.
Note 3: Rights of the review of the decision are attached.