Planning Approval Decision Notice
The Town and Country Planning (Development Procedure) Order 2005
Application Ref. No: 09/00463/B Ref: PF/PC/AA Date of Man Town and Country Planning Act 1999 The Town and Country Planning (Development Procedure) Order 2005 Partington Nixon & Kinrade 7-9 Drinkwater Street
Douglas
IM1 1AT
In pursuance of powers granted under the above Act and Order the Department of Local Government and the Environment does hereby APPROVE the following application made on behalf of:
Name: Robert & Rachel Holden
Proposal:
Construction of extension to replace existing rear elevation conservatory and extension to driveway
at:
39 Cherry Walk
Douglas
Isle of Man
IM2 5NW
which was considered on 22nd May 2009, subject to compliance with the conditions specified below. Date of Issue: 27th May 2009 Murray House Mount Havelock
Douglas
Deputy Secretary Planning Committee
Schedule Of Conditions:
- The development hereby permitted shall commence before the expiration of four years from the date of this notice.
- This approval relates to the submitted drawings 4243/L1, 4243/S1 and 4243/P1 all received on 18th March, 2009.
- The window to be formed in the first floor level stairway shall only be glazed or re-glazed with obscure glass to Pilkington Level 5 or equivalent.
This decision was made by the Senior Planning Officer in accordance with the authority delegated to her under Article 3(13) of the Town and Country (Development Procedure) Order 2005.
09/00463/B
Guidance Note
This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.
Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.
A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department's website www.gov.im/ dlge/planning/plan/applications/decision.xml
Please note that a copy of the Officer's report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.
The proposed development must not be commenced until either;
- The time for requesting an appeal has expired; or
- Any appeal has been determined;
Whichever is the later.