Loading document...
==== PAGE 1 ====
Isle of Man Government £Ntrn V4natn Mr Kevin Quirk 12 First Avenue Douglas Isle Of Man IM2 6BA Town and Country Planning Act 1999 The Town and Country Planning (Development Procedure) (No 2) Order 2013 In pursuance of powers granted under the above Act and Order the Department of Infrastructure determined to APPROVE a pianning application by Joey Dunlop Foundation, Ref 14/00522/B, for the Extension to existing fire escape platform, removal of steps and creation of pedestrian access onto Braddan Road at Braddan Bridge House Peel Road Braddan Douglas Isle Of Man IM4 4TN subject to compliance with the following condition(s): The development hereby approved shall be begun before the expiration of four years from the date of this decision notice. 1. Reason: To compiy with article 14 of the Town and Country Planning (Development Procedure) (No2) Order 2013 and to avoid the accumulation of unimplemented planning approvals. Notwithstanding the submitted plans, the existing external stair may be retained. 2. REASON: this is a minor modification to the approved plans which will have no discernible or material impact on the proposed development. 3. Within 3 months of the erection of the new waikway both the existing and proposed railings/handrails must be painted black and maintained as such thereafter. This approval relates to JDF-RAMP-OOIC sheets 1 and 2 Date of Issue: 24th June 2014 /H Director of Planning and Building Control
==== PAGE 2 ====
Guidance Note This decision was made by the Planning Committee in accordance with the authority delegated to it. This permission refers only to Uiat required under the Town and Country Planning (Development Procedure) (No 2) Order 2013. Any appeal against this decision must be in accordance with Article 8 of the Order. A valid appeal must be in writing, signed by the appellant, and submitted to the Department within 21 days of the date of this Notice. To further validate the appeal it must contain: • Payment of a planning appeal fee as prescribed in an order made by the Department under Section 1(1) of the Fees and Duties Act 1989 (currently £150); • The reasons for making the appeal; and • An election to have the appeal conducted by means of an inquiry (a hearing) or by means of written representation. An appeal form and guidance notes are available from either Planning & Building Control, Tel 685950, or to download from the Department's website httn://www.gov.im/categorie.s/Dlannitig-and-buildiiig-controiyDlanning-development-CQntrQl/planning- appeals/how-to-apneal/ Please note that a copy of the Officer's report which led to the decision, together with correspondence relative to the application, are available for inspection at the Department. The proposed development must not be commenced until either; • The time for requesting an appeal has expired; or • Any appeal has been determined; Whichever is the later. If no appeal is lodged within 21 days of the date of issue overleaf, and this decision becomes final, the Department's public reference copy (counter copy) of the planning application may be collected by the applicant or their agent from Murray House. Please note that if the counter copy of the apoUcation is not collected within THIRTY DAYS following the last date on which a planning appeal can be made it will be destroyed without further notice. Department of Infrastructure, Planning & Building Control, Murray House, Mount Havelock, Douglas Isle of Man, IMl 2SF. Email [email protected]. Tel 01624 685950
Copyright in submitted documents remains with their authors. Request removal