1 April 2011 · Planning Committee
Land Adjacent To, Ginger Hall Hotel, Ballamanagh Road, Sulby, Isle Of Man, IM7 2hb
The proposal involves four identical single-storey bungalows, each with a floor area of approximately 130 sqm, ridge height of 6.7m, width 13.5m and depth 10.6m, plus detached double garages and gravel drives, on a site zoned for predominantly residential use and woodland in Sulby.
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The site is zoned for residential development, establishing the principle as acceptable. Unlike the refused 09/00504/B appeal, this full detailed scheme demonstrates four single-storey dwellings are f…
Strategic Policy 1
Requires optimising previously developed/under-used land, efficient site use considering access/landscaping/amenity, utilising existing infrastructure. Officer assessed site as unused residential-zoned land in Sulby (last housing site), four dwellings make best/efficient use vs local brief's two.
Strategic Policy 2 - Priority for new development to identified towns and villages
New development primarily in towns/villages or extensions, countryside exceptional. Site in village fits; supports efficient use over local plan prescription.
General Policy 2
Permits zoned development respecting site/surroundings (siting/layout/scale/design/landscaping), no adverse amenity/character/highway/habitat impacts, adequate parking/services. Proposal complies via single-storey design matching locality, distances prevent overlooking/loss of light, highway conditions, no ecology issues.
Housing Policy 1
Provision for 6000 dwellings 2001-2016. Contributes to housing supply.
Housing Policy 6
Zoned residential per area plan brief, but briefs not needlessly prescriptive. Local brief (max 2 dwellings) overridden by Strategic Plan para 1.4.4 as later document, no justification given for 2; 4 fits without harm.
Time limit
The development hereby permitted shall commence before the expiration of four years from the date of this notice.
Approved drawings
This approval relates to the residential development comprising four detached dwellings and garages as proposed in the submitted documents and drawings 09 0513/2, 09 0513/4A, 09 051305, 09 051306, 09 051307, 09 051308, 09 051309, and 09 0513/10 all received on 7th February 2011.
Landscaping scheme
No development shall take place until full details of both hard and soft landscaping works have been submitted to and approved in writing by the Planning Authority and these works shall be carried out as approved. Details of the hard landscaping works include footpaths and hard surfacing materials. The hard landscaping works shall be completed in full accordance with the approved details prior to the first occupation of any of the proposed dwellings hereby permitted. All planting shall be carried out in accordance the approved details in the first planting and seeding seasons following that first occupation. Any trees or shrub which within 5 years from the completion of the development dies, is removed or becomes seriously damaged or diseased shall be replaced in the next planting season with another of similar size and species unless the planning authority gives written consent to any variation.
Roof materials
The roof(s) must be finished in dark natural slate.
Traffic mirror
Prior to the commencement of construction of any dwellings on the site a traffic mirror shall have been erected in accordance with details which will have been first agreed in writing with the Planning Authority. The mirror shall be retained and maintained in good order thereafter.
Access/visibility splays
Prior to the commencement of construction of any dwellings on the site, the access arrangements as indicated on drawing 09 0513/4 REV A are to be implemented and completed to provide the required visibility splays.
Approve subject to condition for traffic mirror; visibility splays acceptable as maximum achievable and improved over prior approval
No objection subject to conditions on foul sewer connection, no surface water to foul, maintenance of SW system clarified
Approve unanimous subject to satisfactory drainage arrangements
Comments received - contact for works near cables/overhead lines, electricity supply