10 April 2013 · Delegated - Director of Planning and Building Control (M Ballagher)
Peveril Building, Peveril Square, Douglas, Isle Of Man, IM1 2bs
The proposal involves a 14m high, 200mm diameter stainless steel flue emerging at first floor level from Peveril Buildings, an office complex opposite the Sea Terminal, rising 1m above the flat roof at the rear. It addresses fumes building up in the car park from the existing generator exhaust.
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The flue, though substantial, will not be publicly visible as it is at the rear of the building. It will not detrimentally affect amenities due to surrounding land uses dominated by offices, restauran…
General Policy 2
Requires development in accordance with zoning and other policies, respecting site/surroundings in siting/layout/scale/design, not adversely affecting townscape character, local amenities, or adjoining land uses. Officer assessed the flue against criteria b, c, g, k, l, m; found compliant as no use change in office zone, rear siting not visible publicly, no amenity harm in commercial area with street-facing residential outlooks, no prejudice to neighbours.
Time limit
The development hereby permitted shall commence before the expiration of four years from the date of this notice.
Approved drawings
This permission relates to the installation of a flue as shown in drawings SCS 7769C/M/01 and SCS 7769C/M/02 both received on 13th March, 2013.
no objection to the application