24 March 2025 · Delegated - Director of Planning and Building Control (Jennifer Chance)
Field 311835, Glenfaba Road, Peel, Isle Of Man, IM5 1dx
This application sought approval of detailed information required by condition 9 of the previously approved PA 23/01407/B for a new Sewage Treatment Works and vehicular access. The submitted documents include a comprehensive Drainage Strategy covering site conditions, proposed SuDS measures, attenuation for conventiona…
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The submitted documentation, including the Drainage Strategy (drawing 10057112-ARC-XX-XX-RP-C-8100 C01), provides comprehensive details on surface water drainage, site clearance, and ground preparatio…
No objection as long as defined conditions set out in the Section 18 consent are imposed; proposed controls of surface water are deemed adequate with daily monitoring required.
Satisfied with the proposed discharge control measures and monitoring; utilisation of sustainable drainage systems (SuDS) and separate attenuation systems for conventional and contaminated surface water run-off has been proposed in line with best practice.
No comment to make on their drainage proposals.
Do Not Oppose.
Flood Risk Management Division responded with DNO (Do not oppose) to the discharge of condition 9 for PA 23/01407/B.
Department of Infrastructure Flood Risk Management Division
No ObjectionDNO; Do not oppose