Subject: RE: Peel Sewage Treatment Works - Conditions Discharge - Consultation Required From: "Reynolds, Stephanie" [email protected] Date: 2025-03-18 12:44:34+00:00
Hi Charlotte,
EPU have no comments or concerns with any of the documents provided below. We're satisfied that all proposed waste facilities hold the appropriate waste disposal licences, and suitable measures are being taken to protect the watercourse from pollution.
Kind regards,
Steph
Stephanie Reynolds
Environmental Protection Officer
Department of Environment, Food & Agriculture
Environmental Protection Unit
Thie Slieau Whallian
St Johns
Isle of Man
IM4 3AS
Mob: 07624 212771
Email: [email protected] mailto:[email protected]
Working Together for a Sustainable Future
Gobbragh Cooidjagh Son Traa Ry-Heet Shassooagh
From: Renton, Simon [email protected] Sent: 17 March 2025 17:05 To: Reynolds, Stephanie [email protected] Cc: Gatt, Charlotte [email protected] Subject: FW: Peel Sewage Treatment Works - Conditions Discharge - Consultation Required
Hi Stephanie,
Would you be able to have a look at this PA?
Thanks,
Simon
From: Gatt, Charlotte <[email protected] mailto:[email protected] > Sent: 17 March 2025 15:20 To: Renton, Simon <[email protected] mailto:[email protected] > Cc: DEFA, Planning Conditions <[email protected] mailto:[email protected] > Subject: Peel Sewage Treatment Works - Conditions Discharge - Consultation Required
Hi Simon,
I hope you are well.
Appreciate you've been away from the office and have just returned today from what I have been told, but would you please be able to provide consultation on the following conditions in relation to the below application:
23/01407/B https://pbc.gov.im/online-applications/applicationDetails.do?keyVal=S4XQPBIPK6C00&activeTab=summary - The construction of a new Sewage Treatment Works and creation of new vehicular access
25/10020/AIR https://pbc.gov.im/online-applications/applicationDetails.do?activeTab=documents&keyVal=SPVTDUIP0EE00 - Information in relation to condition 6 of PA 23/01407/B providing details for the Construction Waste Management Plan
Condition 6 - No works shall commence, including any works of site clearance and ground preparation, until a Construction Waste Management Plan has been submitted to and approved in writing by the Department. The Plan shall identify the main waste materials expected to be generated during the construction phase, together with measures for dealing with such materials so as to minimise waste and maximise re-use and recycling. Development shall be carried out in accordance with the approved Plan.
Reason: In order to secure more efficient use of energy through waste reduction, pursuant to the Strategic Objective (Resources) of the Strategic Plan.
25/10015/AIR https://pbc.gov.im/online-applications/applicationDetails.do?activeTab=documents&keyVal=SPVQQVIP0EE00 - Information in relation to condition 7 of PA 23/01407/B detailing the dust management plan
Condition 7 - No works shall commence, including any works of site clearance and ground preparation, until a scheme for the mitigation of dust nuisance during the construction period has been submitted to and approved in writing by the Department. Development shall be carried out in accordance with the approved Plan.
Reason: In order to protect air quality for those living and working in the vicinity of the site.
25/10016/AIR https://pbc.gov.im/online-applications/applicationDetails.do?activeTab=documents&keyVal=SPVR26IP0EE00 - Information in relation to condition 8 of PA 23/01407/B detailing measures to control the storage, handling and disposal of polluting material and details regarding erosion measures.
Condition 8 - Drainage
No works shall commence, including any works of site clearance and ground preparation, until details of the following have been submitted to and approved in writing by the Department. The details to be submitted, which relate to the construction period, shall include:
i) a silt management plan;
ii) measures to control the storage, handling and disposal of polluting material;
iii) construction of a sustainable drainage system or filtering of silt laden run-off; and
iv) measures to ensure that work to existing surface water features does not case erosion.
Development shall be carried out in accordance with the approved details.
Reason: In order to minimise the environmental impact of the development.
If you take a look at the details that have been provided in the links that I have added, and let me have any comments that you feel would be relevant as soon as you can, I would be most grateful.
Thanks ever so much.
Kindest Regards
Charlotte
Charlotte Crowe
Planning & Building Control Directorate
Department of Environment, Food & Agriculture (DEFA)
Murray House | Mount Havelock | Douglas | Isle of Man |IM1 2SF
--
Any views expressed in this email are those of the officer only and are without prejudice to any formal decision made under the provisions of the Town and Country Planning Act 1999 and any relevant secondary legislation.
Please be aware that should the content of this email be materially relevant to a planning application, its content may be published as detail relevant to the formal assessment of the application. Publication will include availability via online services.
Please don't print this email unless you really need to - P Ny clou yn port-l shoh mannagh vel feme mooar ayd my sailliu -