DEC Decision Notice
Construction Design Ltd 2nd Floor 17 Peel Road Douglas Isle Of Man IM1 4LP
TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure)(No 2) Order 2013
In pursuance of powers granted under the above Act and Order the Department of Environment, Food and Agriculture determined to APPROVE an application by Manx Metal (1983) Ltd, Ref 19/00893/B, for the Doorway alteration and creation, replacement of cladding and subdivision of existing industrial unit into three industrial units at Unit 1 Manx Metals Old Mart Place Colas Drive Balthane Industrial Estate Balthane Ballasalla Isle Of Man IM9 2AQ subject to compliance with the following condition(s) and notes (if any):
- 1. The development hereby approved shall be begun before the expiration of four years from the date of this decision notice.
Reason: To comply with article 14 of the Town and Country Planning (Development Procedure) (No2) Order 2013 and to avoid the accumulation of unimplemented planning approvals.
- 2. Prior to development commencing, details of cycle storage facilities for each unit shall be submitted to and approved in writing. A minimum of two cycle spaces per unit will be required. The cycle storage facilities shall be constructed prior to development being occupied. Reason: to promote alternative modes of travel and support active travel.
This approval relates to drawing numbers 962-001, 962-002, 962-003 date stamped and received 8 August 2019.
Date of Issue: 26th September 2019
Director of Planning and Building Control
Guidance Note
This decision was made by a Principal Planner in accordance with the authority delegated to them.
All correspondence which led to the assessment and decision is available to view on the Government’s website (via Online Services) or at the Department’s offices Murray House, Mount Havelock, Douglas.
https://www.gov.im/planningapplication/services/planning/search.iom This decision refers only to that applied for under the The Town and Country Planning (Development Procedure)(No 2) Order 2013.
Any appeal against this decision must be in accordance with the criteria set down in that instrument.
Specifically, a valid appeal must be in writing, signed by the appellant, and submitted to the Department within 21 days of the date of this Notice. To further validate the appeal it must contain:
- Payment of a planning appeal fee as prescribed in the current Fees Order;
- The reasons for making the appeal; and
- An election to have the appeal conducted by means of an inquiry (a hearing) or by means of written representation.
An appeal form and guidance notes are available from either Planning & Building Control, Tel 685950, or to download from the Department’s website https://www.gov.im/categories/planning-and-building-control/planningapplications/planning-appeals/how-to-appeal/
If no appeal is lodged within 21 days of the date of issue overleaf, and this decision becomes final, the Department’s public reference copy (counter copy) of the planning application may be collected by the applicant or their agent from Murray House.
PleasenotethatifthecountercopyoftheapplicationisnotcollectedwithinTHIRTY DAYS following the last date on which a planning appeal can be made it will be destroyedwithoutfurthernotice.