General Policy 3
Source: Isle of Man Strategic Plan 2016
General Policy 3: Development will not be permitted outside of those areas which are zoned for development on the appropriate Area Plan with the exception of:
- essential housing for agricultural workers who have to live close to their place of work; (Housing Policies 7, 8, 9 and 10);
- conversion of redundant rural buildings which are of architectural, historic, or social value and interest; (Housing Policy 11);
- previously developed land (1) which contains a significant amount of building; where the continued use is redundant; where redevelopment would reduce the impact of the current situation on the landscape or the wider environment; and where the development proposed would result in improvements to the landscape or wider environment;
- the replacement of existing rural dwellings; (Housing Policies 12, 13 and 14);
- location-dependent development in connection with the working of minerals or the provision of necessary services;
- building and engineering operations which are essential for the conduct of agriculture or forestry;
- development recognised to be of overriding national need in land use planning terms and for which there is no reasonable and acceptable alternative; and
- buildings or works required for interpretation of the countryside, its wildlife or heritage.
6.4.1 Where development is acceptable and in accordance with the provisions of this Plan and the relevant Area Plan, but raises issues which cannot be addressed by the imposition of planning conditions, the Department will seek to conclude an Agreement with the developer under Section 13 of the 1999 Town and Country Planning Act.
3,237
Citations
72.6%
Approval Rate
2023
Peak Year
Malew
Top Parish
Erection of ancillary building (retrospective), alterations and use as a workshop and private clock collection display and storage facility
The installation of 3 antennas onto existing lattice mast and installation of 1 replacement equipment cabinet
Widening of existing vehicular gate access, increasing existing gate pillars in height and installation of new personnel gate
The preparatory engineering of the Old Turkeyland Landfill Cells A, B & C, the erection of an Office & Welfare Facility with associated weighbridge and staff parking and the operation of a Strategic Waste Landfill Facility for the Isle of Man.
Re-roofing and installation of roof-mounted solar panels
Replacement of existing greenhouse with summerhouse
The winning and working of minerals (Sand and Gravel) comprising a westerly lateral extension to Point of Ayre Quarry and all associated ancillary development, with progressive restoration to wetland habitat.
Replacement of existing outbuilding with new outbuilding
Erection of permanent non-illuminated sign to nature reserve entrance
Erection of a detached steel portal frame agricultural building