Environment Policy 40
Source: Inspectors Report For The Area Plan For The East 100123
to these policies. The final sentence of Urban Environment Proposal 8, which states that there is no presumption against the development of archaeological sites, appears potentially to contradict Environment Policy 40 of the Strategic Plan, which indicates that development which would damage, disturb or detract from an archaeological site or its setting will not be permitted. I recommend that Urban Environment Proposal 8 be deleted from the draft Area Plan.
53 Urban Environment Proposal 9 refers to the protection of station buildings, gate-keeper's huts and other line-side structures. However, it seems to me that if they are worthy of preservation, these buildings should be registered. While I do not doubt their cultural importance, in the absence of their registration, it is not clear to me how the planning authority could prevent their demolition or removal. I recommend that Urban Environment Proposal 9 be deleted from the draft Area Plan.
54 The Area Plan recognises that that there is already traffic congestion at the Quarterbridge junction; at the junction between Mountain Road and Governor's Road; and at the junction between Glencrutchery Road and Victoria Road. The evidence is that if all the development sites identified in the draft Area Plan were to be built-out, and no improvements were made to the road system, there would be a significant increase in congestion in Douglas and Onchan. Modelling commissioned by the Government suggests that, in the worst case, the average speed of traffic during the afternoon peak could decrease from 19mph to 12mph. Some journey times would be likely to increase by more than 100%, when compared with 2016 data. This would affect both private and public transport. However, it seems to me that, in practice, this worst case scenario is unlikely to arise.
55 Opportunities for additional carriageway provision are very limited and none are proposed in Douglas or Onchan in the Area Plan. However, there may be potential for limited highway improvements in the proposed Comprehensive Treatment Areas. Additionally, there is scope for the installation of an improved system of traffic signals, which could improve the capacity of the existing road network, particularly at junctions. Further mitigation could result from the introduction of the Active Travel Strategy, whereby drivers are to be encouraged to walk or cycle to their destinations, where this is practicable. Children living reasonably close to their school could be encouraged to walk there (perhaps in a supervised 'walking bus'); or go by bike. Reduced car use might also be achieved by a modal shift in favour of public transport; or car travellers could be encouraged to share a single vehicle, wherever possible. There may also be increasing scope for some office workers to undertake their duties at home, by making use of IT facilities.
56 Experience has shown that increasing peak period road congestion often results in 'peak spreading', where car users choose to begin their journeys a little earlier (or later) in order to avoid the worst delays. Congestion charging has also been shown to be an effective way of managing peak period delays. However, a degree of peak hour congestion is characteristic of most urban areas, and is perhaps an inevitable consequence of mass car commuting.
57 The Braddan Parish Commissioners argued that the provision of cycle parking and changing facilities should be encouraged at places of employment. I agree. Chapter 11.5.3 of the Strategic Plan already states that 'consideration should be given to cycle parking for staff … in non-residential development'. However, I consider that such provision could appropriately be required as part of a development brief for any proposed employment site. I also consider that employers should be encouraged to introduce Travel Plans, with the aim of reducing the level of car commuting. I recommend that the provision of cycle parking and changing facilities, and the production of a Travel Plan, should be considered for any proposed employment development.
58 The Braddan Parish Commissioners, Miss P Newton and others urged that consideration be given to the introduction of a 'park and ride' scheme, whereby drivers entering Douglas would be encouraged to leave their vehicles at a peripheral car park and complete their journeys by bus. I understand that a previous 'park and ride' scheme had only limited success, and no firm proposal to try again has been put forward by any Government Department. I see no purpose in allocating land for a park and ride facility in the Area Plan, unless there is a good prospect of the requisite investment being made to bring such a scheme to fruition during the plan period.
59 The TT Access Road provides the sole vehicular route to and from the interior of the TT course when racing is in progress. It is a single track carriageway with passing places, whic
6
Citations
83.3%
Approval Rate
2023
Peak Year
Lonan
Top Parish
Erection of 2No Detached Dormer Bungalows with Detached Garages Incorporating amendments to PA 21/01567/B
Construction of seven detached houses and associated infrastructure
Replace existing east glazed screen with new glazed screen which incorporates ventilation to reduce damp build up inside the shelter.
Erection of a leisure-led mixed use development including a 7 screen cinema, 80 bedroom hotel, 20 residential apartments (14 two bed and 6 three bed units), 3 restaurant/cafe units (Class 3), 4 retail units (Class 1), information centre, public toilets, a drivers' welfare area, multi storey car park (198 car spaces and 16 motorbike spaces), back of house area, plant facilities, circulation space, 5 bus stances on Lord Street with associated waiting areas, site development and landscaping works within a series of five to seven storey buildings.
Erection of three 10 Kw wind turbines
Erection of stables with yard, creation of an access track and formation of an entrance with associated landscaping