Environment Policy 5: In exceptional circumstances where development is allowed which could adversely affect a site recognised under Environmental Policy 4, conditions will be imposed and/or Planning Agreements sought to:
- minimise disturbance;
- conserve and manage its ecological interest as far as possible; and
- where damage is unavoidable, provide new or replacement habitats so that the loss to the total ecological resource is mitigated.
7.8.7 In addition to existing, specific areas of the Island designated as being important areas for landscape value, nature conservation and ecological habitats, there are also wider areas which are increasingly being recognised as having combined importance in terms of ecological, archaeological, landscape and / or scientific value. These areas should be fully investigated to assess the extent of these qualities and, where appropriate, their potential for a new designation in the form of 'National Heritage Areas'. This should be in addition to any other designation afforded to them under existing legislation or any new landscape assessment exercise.
84
Citations
92.8%
Approval Rate
2024
Peak Year
Braddan
Top Parish
Information in relation to conditions 3 and 4 of PA 24/00683/B providing details for the landscaping layout and biodiversity mitigation
Removal of existing porch, replacement of single storey outrigger with two storey extension, refurbishment of existing roof
Extension of existing sand and gravel quarry, extraction of sand and gravel for processing on site, restoration of the land to natural habitat
Alterations and installation of balcony
Information in relation to condition 2 of PA 23/01042/B providing details for the Construction Environmental Management Plan (CEMP) and Construction Environmental Statement (CES) outlining measures to be put in place to protect nesting birds, roosting bats and surrounding habitats.
Erection of a single-storey extension above the rear annexe. Erection of a two-storey side extension. Installation of replacement and new PV cells.
Installation of rockfall safety netting on the rock face above yards 3-5 South Quay Industrial Estate.
Alterations to existing garage including first floor extension for storage above
Erection of Polytunnel
Creation of a campsite for 15 pitched tents, 10 motor homes and 3 Shepherd style accommodation huts with associated shower and toilet facilities, reception office and parking