==== PAGE 1 ====
1
2
1
2
LEGEND:
01
Existing clay roof tiles to be removed.
New artificial slates or concrete roof tiles.
02 Existing fascia boards, rainwater gutters and
soffit boards to be removed. New uPVC
fascia boards and vented uPVC soffits. New
uPVC ogee profile rainwater gutters.
03
Existing rainwater downpipes to be removed.
New 68mmØ uPVC rainwater downpipes.
04
Existing uPVC windows to be removed.
New uPVC framed double glazed windows.
05
Remove existing satellite dishes and fit new.
06
Redundant TV aerials to be removed.
07
Existing door to be removed. New uPVC
door.
08
Existing garage door to be removed.
New platisol coated up-and-over garage
door.
09
Existing profiled asbestos cement or metal
garage roof sheet to be removed. New
profiled plastisol coated steel roof sheet with
plastisol coated steel verge profiles.
10
Demolish existing chimney stack.
11
Existing entrance door to be removed.
New uPVC double glazed entrance door.
12
Existing side and rear doors to be removed.
New uPVC double glazed side rear doors.
13
Existing structures against wall are to be
removed to effect renovations.
14
Existing gate and gate posts to be removed.
New timber vertical boarded gate c/w new
gate posts (painted or stained).
15
Demolish existing masonry parapet or piers
16
Repair and paint existing render
17
New timber vertical hit and miss fencing
panels between existing concrete posts
18
New weathered precast concrete coping
red line denotes demolition or items to be
removed
GENERAL NOTES
DRAWING NOTES
REV.
FILE REF.: 2104_4_ELEVS
This drawing is not to be used on site unless issued for
construction.
All setting out is to be checked & confirmed on site.
All levels are to be checked & confirmed on site.
Figured dimensions are to be used in preference to
scaled dimensions. All dimensions are to be checked on
site prior to construction or fabrication.
Any discrepancies on this drawing or between this and
any other relevant drawings are to be reported to the
Architect.
The copyright of this drawing is held by the Architect and
the drawing may not be reproduced without the
Architect's written permission.
DATE
DETAILS
This drawing has been prepared for the Department
of Infrastructure (Public Estates & Housing Division)
and their immediate advisers, and must not be
reproduced in whole or in part, or relied upon, by
any third party, without the express prior written
authority of the Architect. The drawing is provided
for use in connection with the below mentioned
project only, and must not be used for any other
purpose.
NOT ISSUED FOR CONSTRUCTION
front elevation
as existing
rear elevation
as existing
front elevation
as proposed
rear elevation
as proposed
PROJECT TITLE
DRAWING TITLE
SCALE
DRAWING NO.
DATE
REVISION
External Refurbishment
1-8 The Threshold
Jurby
Typical Elevations
1:100 @ A1
20/01/23
2106_129
DRAWN
CHECKED
JH
JH
preliminary
01
02
02
03
03
03
03
04
04
04
04
04
04
04
04
04
04
04
04
04
04
04
04
04
04
04
04
04
04
04
04
04
04
04
04
05
10
11
11
12
12
14
14
16
16
16
16
16
16
16
16
02
10
10
10
01
01
01
01
01
01
01
P.O. Box 2|Castletown|Isle of Man|IM99 5DJ
E [email protected]
T 01624 825 852
W www.modus.co.im
no. 1/3/5/7 side elev.
as existing
no. 2/4/6/8 side elev.
as existing
no. 1/3/5/7 side elev.
as proposed
no. 2/4/6/8 side elev.
as proposed
typical garage
as existing
side elevation
(facing house)
rear elev.
side elevation
(facing boundary)
side elevation
(facing house)
rear elev.
side elevation
(facing boundary)
front elev.
typical garage
as proposed
front elev.
16
16
16
16
09
07
08
17
typical outbuilding
as existing
side elevation
(facing house)
rear elev.
side elevation
(facing boundary)
side elevation
(facing house)
rear elev.
side elevation
(facing boundary)
front elev.
typical outbuilding
as proposed
front elev.
16
16
16
17
17
17
17
09
09
09