Loading document...
==== PAGE 1 ====
Department of Environment, Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure) Order 2019 In pursuance of powers granted under the above Act and Order the Department of Environment, Food and Agriculture determined to APPROVE an application by Department Of Infrastructure, Ref 25/90846/B, for the Installation of Klargester sewerage treatment system to serve existing public toilets and kiosk at Peel Breakwater West Quay Peel Isle Of Man . Any conditions or notes which apply to the approval are set out below. This approval is subject to compliance with any conditions listed and may not be implemented until it becomes final (see guidance notes). 1. The development hereby approved shall be begun before the expiration of four years from the date of this decision notice. Reason: To comply with Article 26 of the Town and Country Planning (Development Procedure) Order 2019 and to avoid the accumulation of unimplemented planning approvals. The development hereby permitted shall be carried out in accordance with the following approved plans received 08.09.2025: General Arrangement Existing and Proposed Layout Plans & Elevations Drawing Number 25014- KCE-XX-ZZ-D--C--50001-P03 Drainage Details Drawing Number 25014-KCE-XX-ZZ-D--C--50003-P01 Received 12.11.2025: Drawing: Plan 1 Received 25.11.2025: General Arrangement Proposed Drainage Layout and Long Section Drawing Number 25014- KCE-XX-ZZ-D--C--50002-P05 NOTE The applicant should be aware that the proposed activity appears to be undertaking works and/or discharging into a statutorily protected Marine Nature Reserve and should apply appropriate consideration and mitigation measurers as appropriate, noting that there is specific legislation protecting the marine environment at this site, which must be complied with. This decision has been made for the following reasons(s) The proposed development would stop the discharge of wastewater into the Irish Sea which is significant benefit that is welcomed. Most of the infrastructure is located within the substructure
==== PAGE 2 ====
Department of Environment, Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 of the Breakwater which is also welcomed and helps to minimise any landscape harm or harm to the setting of Peel Castle. Where above ground infrastructure is required it is proposed in the most logical location to help reduce this potential for harm. Accordingly it is judged that the proposed development complies with the relevant policies of the Peel Local Plan 1988 and the relevant policies of the Isle Of Man Strategic Plan 2016 and therefore it is recommended that the application be approved. Date of Issue: 27th January 2026 A MORGAN Interim Director of Planning and Building Control
==== PAGE 3 ====
Department of Environment, Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Guidance Note This decision was made by a Principal Planner in accordance with the authority delegated to them. This decision refers only to that applied for under the Town and Country Planning Act 1999 and its subordinate legislation. A copy of the Officer’s report and any correspondence which informed the assessment and decision is available to view on the Government’s website (via https://pbc.gov.im/online- applications/) Implementation A determination to grant planning approval does not have effect - · if an appeal is submitted until the appeal is determined or withdrawn; or · if no appeal is submitted, but there are potential appellants in addition to the applicant, until the time within which an appeal may be submitted has expired (21 days from the date of this notice). Development must be carried out in accordance with the approved plans and any attached conditions (irrespective of any changes that may separately be requested at the Building Control stage or by any other Statutory Authority). This approval does not remove the need to also comply with any other relevant legislation. Any conditions requiring certain works, submissions etc. prior to commencement of development must be fulfilled prior to work starting on site. Failure to adhere to this approval and meet the requirements of all conditions may invalidate this approval or result in formal enforcement action. Appeal Any appeal can only be made by a person who has been accorded rights to do so, must be in writing, include the appropriate fee and be submitted to the Department within 21 days of the date of this Notice. Guidance on how to appeal is available at gov.im/howtoappeal
Copyright in submitted documents remains with their authors. Request removal