Loading document...
==== PAGE 1 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Penketh - Millar 23 West Quay Ramsey Isle Of Man IM8 1DL TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure) Order 2019 In pursuance of powers granted under the above Act and Order the Department of Environment, Food and Agriculture determined to APPROVE an application by Fairway Construction Ltd, Ref 22/00444/B, for the Erection of 2 detached dwellings with integral garages at Land Adjacent To St Olave's Jurby Road Ramsey Isle Of Man . Any conditions or notes which apply to the approval are set out below. This approval is subject to compliance with any conditions listed and may not be implemented until it becomes final (see guidance notes). 1. The development hereby approved shall be begun before the expiration of four years from the date of this decision notice. Reason: To comply with Article 26 of the Town and Country Planning (Development Procedure) Order 2019 and to avoid the accumulation of unimplemented planning approvals. 2. The visibility splay(s) identified on drawing 09; shall be constructed in accordance with the approved plans and thereafter kept permanently clear of any obstruction exceeding 1050 mm in height above adjoining carriageway level. Reason: In the interests of highway safety. 3. The development hereby approved shall not be occupied or operated until the parking and turning areas have been provided in accordance with the approved plans. Such areas shall not be used for any purpose other than the parking and turning of vehicles associated with the development and shall remain free of obstruction for such use at all times. Reason: To ensure that sufficient provision is made for off-street parking and turning of vehicles in the interests of highway safety. 4. Prior to the commencement of any development a schedule of materials and finishes and/or samples of the materials to be used in the construction of the external surfaces, including roofs, have been submitted to and approved in writing by the Department. The details shall demonstrate how one of the dwellings external ground floor elevations will be
==== PAGE 2 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 finished differently to the other dwelling hereby approved and also the window frames shall be finishes in aluminium or timber windows. The development shall not be carried out unless in accordance with the approved details.
Reason: In the interests of the character and appearance of the site and surrounding area. 5. Along the north west elevation of Plot 1 all scaffolding shall only be 2 boards in width (0.8m), unless otherwise agreed in writing with the Department.
Reason: In the interest of tree protection of neighbouring trees. 6. Prior to the occupation of either dwelling hereby approved a 1.8m high obscure glazed/privacy screen is requires to be installed along the western elevation of the ground floor rear balconies of both dwellings and retained thereafter. Reason: in the interest of neighbouring amenities. 7. The front boundary wall shall be finished in Manx stone (as existing) to a height of 1m unless otherwise agreed in writing with the Department. Reason In the interests of the character and appearance of the site and surrounding area. 8. Notwithstanding the provisions of the Town and Country Planning (Permitted Development) Order 2012 (or any Order revoking and/or re-enacting that Order with or without modification) no extension, enlargement or other alteration of the dwelling(s) hereby approved, other than that expressly authorised by this approval, shall be carried out, without the prior written approval of the Department. Reason: To control development in the interests of the amenities of the surrounding area. This approval relates to the submitted documents and drawing all received on 07.04.2022. This decision has been made for the following reasons(s) In conclusion; for the reasons indicated with this report it is concluded the proposals complies with the relevant planning policies of the Isle of Man Strategic Plan 2016, Residential Design Guide 2021 and the Ramsey Local Plan. Date of Issue: 5th August 2022 Director of Planning and Building Control
==== PAGE 3 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Guidance Note This decision was made by a Principal Planner in accordance with the authority delegated to them. This decision refers only to that applied for under the Town and Country Planning Act 1999 and its subordinate legislation. A copy of the Officer’s report and any correspondence which led to the assessment and decision is available to view on the Government’s website (via Online Services www.gov.im/Viewapplications) or at the Department’s offices Murray House, Mount Havelock, Douglas. Implementation The decision does not become final until either · Any appeal has been concluded; or · 21 days have passed since the date on this notice and no appeal has been submitted Development must progress in accordance with the plans approved under, and any conditions attached to this approval (irrespective of any changes that may separately be requested at the Building Control stage or by any other Statutory Authority). This approval does not remove the need to also comply with any other relevant legislation. Any conditions requiring certain works, submissions etc. prior to commencement of development must be fulfilled prior to work starting on site. Failure to adhere to this approval and meet the requirements of all conditions may invalidate this approval or result in formal enforcement action. Appeal Any appeal must be in writing and submitted to the Department within 21 days of the date of this Notice. The appeal must contain: · the grounds for making the appeal; · payment of the planning appeal fee (currently £305); and · if relevant, confirmation that the appellant wishes to have the appeal determined by means of an inquiry and payment of the additional inquiry fee (currently £115). Where the appeal is submitted by the applicant they must: · specify in detail and by reference to material planning considerations the reasons why the appellant disagrees with that determination; and · Where against a refusal, on the grounds of deficient detail or supporting documentation, set out why they consider the information or documentation forming part of the application was sufficient in the circumstance. If the appeal is submitted by someone who has interested Person Status but is not listed in Article 4(2) of the Development Procedure Order 2019, that person must relate their grounds for making the appeal to issues which they included in representations made prior to the application being determined. Failure to meet all of the relevant above requirements will mean that the appeal cannot be validated. An appeal form and more detailed guidance are available either from Planning & Building Control, Tel 685950, or from the Department’s website www.gov.im/planningappeal If this decision becomes final because there is no appeal, the Department’s public reference copy (counter copy) of the planning application may be collected by the applicant or their agent from Murray House. Please note that if the counter copy of the application is not collected within thirty days following the last date on which a planning appeal can be made it will be destroyed without further notice.
Copyright in submitted documents remains with their authors. Request removal