22 December 2008 · Planning Committee
Office Shop Corner Garage, Approach Road, Ramsey, Isle Of Man, IM8 1eb
The proposal involved demolishing existing commercial buildings (a filling station/garage) on a corner plot in a predominantly residential area of Ramsey and replacing them with a 4-5 storey block containing 16 apartments (12 one-bedroom and 4 two-bedroom units), including 20 on-site parking spaces.
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The officer assessed that whilst residential redevelopment of the brownfield site was in principle acceptable under the residential zoning and would improve upon the existing garage's adverse visual i…
General Policy 2
Requires development to respect site/surroundings in scale/form/design, not adversely affect townscape/amenity, provide satisfactory access/parking, and avoid unacceptable highway effects. Officer found proposal failed due to massing detracting from street scene, poor parking layout compromising safety, and visual intrusion in prominent corner location.
Environment Policy 42
Requires new development in settlements to reflect local character/identity and prohibits inappropriate development removing visual amenity spaces. Officer assessed the apartment block's scale as failing to respect adjacent low-rise Registered Buildings and introducing intrusive feature.
Transport Policy 7
Requires parking to accord with standards. Whilst 20 spaces met quantum (12x1-bed=12, 4x2-bed=8), layout failed with undersized space and fronting spaces requiring reversing onto main road, affecting visibility/safety.
Housing Policy 5
Requires 25% affordable housing for 8+ unit schemes in residential areas (4 units here). No provision made despite Estates confirmation of need/demand in Ramsey.
Recreation Policy 3
Requires recreational/amenity space provision on-site or commuted sum off-site where appropriate. Overdevelopment left insufficient on-site space with no off-site payment proposed.
Do not oppose
No objection at this stage but permission needed for rear access through their land
No objection but concerns about construction traffic
No objection in principle but preference for related 08/01681/A
Note received, no comment on merits; request contact for services