1 February 2008 · Planning Committee
Hampton Farm, Castletown Road, Douglas, Isle Of Man, IM2 2dn
The application sought full planning approval for a first-time buyer housing development retaining three existing dwellings and adding 36 semi-detached houses plus a three-storey (two-storey plus roofspace) block of 10 two-bedroom apartments on a 1.26ha triangular site bordered by the A5 Castletown Road and Pulrose Gol…
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The officer concluded the scheme proposes too many dwellings (46 units vs prior approval in principle for 30) on a site surrounded by open golf course, resulting in over-intensive development with bui…
General Policy 2
Requires development in land use zones to respect site/surroundings in siting/layout/scale/form/design/landscaping, not adversely affect landscape character/amenity/highways/parking/wildlife/trees/energy use. Officer found proposal fails multiple tests: buildings too close to boundaries requiring off-site planting, unexceptional design not site-specific, rear elevations to A5, tree loss, inadequate parking/amenity, dense entrance, no energy details initially (later provided but insufficient). Tipped against by density in open golf setting.
Housing Policy 5
Requires 25% affordable housing in developments of 8+ dwellings on residential land. All units proposed as affordable/first-time buyer; could be conditioned but satisfied as proposed.
Appendix 7
Requires 2 spaces per dwelling (1 behind building line), 2 per 2-bed apartment; relaxations limited. Fails: no spaces behind lines, apartments short 5 spaces (15 for 10 units), tandem spaces (plots 11/12/17/18), some not alongside properties (plots 41-46), leading to on-street parking on narrow roads; first-time buyer occupancy not accepted as sheltered housing equivalent.
Open Space Standards (Strategic Plan Appendix 6)
Requires specific formal/children's/amenity space for 10+ dwellings, on-site preferred. Provides 348 sqm vs 4096 sqm public open space needed; site isolated by A5, commuted sum not prioritised over on-site provision which density prevents.
Energy Policy 5
Requires design to minimise energy consumption. Initially no info; applicant later provided EIA with 82% efficiency/81% CO2 rating but officer noted lack in core assessment.
No objection in principle
Do not oppose subject to condition
No objection
Would make valuable contribution to affordable housing requirements