11 October 2007 · Director of Planning and Building Control (M. I. McCauley)
Land On, Ronaldsway Industrial Estate, Ronaldsway, Ballasalla, Isle Of Man, IM9 2aw
The proposal involved building a single-storey industrial unit measuring 32.5m long by 13-16m wide with a 7m ridge height, including factory/warehouse space (355 sq.m) and 5 offices/showroom, finished in grey sheeting with red piping, plus associated car parking (amended to 13 spaces).
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The officer confirmed the principle of industrial development is acceptable as the site is designated 'Existing Industrial' under the Isle of Man Planning Scheme (Development Plan) Order 1982.
Isle of Man Planning Scheme (Development Plan) Order 1982
The policy designates the site for industrial use. The officer assessed the proposal as fully compliant in principle, with no conflicts raised. Specific aspects tested were building form, siting and visual impact in industrial context.
Time limit
The development hereby permitted shall commence before the expiration of four years from the date of this notice.
Approved drawings
This permission relates to the erection of an industrial building and associated car parking all as shown in drawings 5276-11 received on 4th July and -12B received on 5th September, 2007.
Foul sewer connection
The proposed development must be connected to the main foul sewer.
No surface water to foul sewer
There must be no discharge of surface water to the main foul sewer.
Dry industrial processes only
The building may be used only for dry industrial processes: the only discharges which will be accommodated in the public foul sewer are domestic sewage from canteens and wcs.
Protect public sewer
Prior to the commencement of works on site, the line of the public sewer must be identified and the sewer protected whilst works are being carried out.
Do not oppose
Do not object to amended plans
No objection subject to conditions regarding drainage
Recommend approval subject to notes on water supply and trunk main liaison
Comments received (recommend consultation on fire precautions)