Applicant: Department Of Infrastructure Proposal Strengthening of the existing river wall and construction of a glass flood wall along the edge of the river to provide flood protection Site Address Shore Hotel River Wall Glen Road Laxey IM4 7DA Case Officer : Mr Jason Singleton Site Visit: Expected Decision Level Planning Committee Recommended Decision: Permitted Date of Recommendation 07.03.2022
C : Conditions for approval N : Notes attached to conditions
Reason: To comply with Article 26 of the Town and Country Planning (Development Procedure) Order 2019 and to avoid the accumulation of unimplemented planning approvals.
This application has been recommended for approval for the following reason. The application would not harm the use and enjoyment of neighbouring properties or considered to harm the watercourse or that of the Laxey Conservation area has been designed
to comply with Strategic Policy 4, General Policy 2 and Environment Policy 7, 22 and 35 of the Strategic Plan 2016.
Plans/Drawings/Information; This approval relates to amended drawings received on the 21st February 2022, referenced;
_______________________________________________________________ Interested Person Status – Additional Persons
It is recommended that the owners/occupiers of the following properties should not be given Interested Person Status as they are not considered to have sufficient interest in the subject matter of the application to take part in any subsequent proceedings and are not mentioned in Article 6(4):
Glen View, South Cape, Laxey as they are not within 20m of the application site and the development is not automatically required to be the subject of an EIA by Appendix 5 of the Strategic Plan, in accordance with paragraph 2B of the Policy
________________________________________________________________ Officer’s Report
THIS APPLICATION IS REFERRED TO COMMITTEE AT THE REQUEST OF THE HEAD OF DEVELOPMENT MANAGEMENT
0.0 PRE-AMBLE - 0.1 Following the officers presentation to committee on the 21/02/22, the applicants submitted amended plans at the meeting to satisfy the commissioners concerns that included; the widening of the ramp from 2.5m to 3m, the utilisation of glass walling in lieu of interim pillars; and the ratio of 50/50 split for glazing to walling. - 0.2 The chair requested the matter to be deferred until the next committee of the 14th March to allow all parties to consider the amended drawings as some members were online and not able to view those plans. The amended plans listed below were uploaded onto the digital planning file following the committee presentation for all parties / stakeholders to view. - 0.3 The amended drawing received on the 21/02/22 are referenced; 102_C - Details of Proposed works 101_B - Site Plan 100_B - Location Plan - 0.4 The owner/occupier of 2 Glen View, South Cape, Laxey made further comment (01.03.22), which raises the concerns about the points as summarised below:
0.5 In response to the above, the concerns noted, although some matters not agreed with. The recommendation amended to add condition re: glass and wildlife (C4). In addition to the above condition, the plans to be referenced on the decision notice have been updated. The report below is otherwise unchanged.
1.0 THE SITE - 1.1 The application site identified in red is the section of river that starts at the new bridge opposite the shore hotel and runs upstream for 60m length to the south of the river and parallel with the pub car park. The applicant notes; "Sections of the existing retaining walls are constructed of mixed materials. Several sections of the walls have been identified as needing urgent attention in recent assessments carried out by the Department". At present there is no walling adjacent to the shore hotel and is only a post and wire with - 1.2 This application is an extension of previous permission for flood defences along Laxey River that started at the woollen mills and extends downstream. Further details of previous approved applications are noted in the planning history below. - 1.3 The previous planning permissions are currently in different stages of fruition as certain works to the river are only allowed outside of the spawning season.
2.0 THE PROPOSAL - 2.1 Proposed is are a series of flood protection measures to the area adjacent to the shore hotel for a length of 60m. This will broadly see the strengthening of the existing river wall and construction of a glazed area (1.1m high from existing ground level) along the river edge that will be integral to the flood protection along this side of the river. Part of the existing concrete tow to the eastern part of the river wall is to remain as is. - 2.2 To the west of the site adjacent to the carpark, is an earth bund that would provide additional flood protection. The agent notes; "the entire point of the earth bund is to provide flood protection to the Shore Hotel and car park area in the event of extreme river levels overtopping the river bank upstream of the new wall. This area would act as a temporary attenuation area until the river levels subsided and would then drain back into the river. I would also point out that the possibility of this actually happening is extremely unlikely. The original concrete ramp has been softened to become integral with the earth bund but still has a concrete surface to allow vehicle access".
3.0 PLANNING POLICY - 3.1 In terms of local plan policy, the application site is within an area designated as 'predominately residential' on Map 7 in the Area Plan for the East December 2020. The Area Plan for the East Written Statement - 3.2 Within the accompanying written statement, Glen Road Laxey does not generally feature, Laxey River is noted amongst other rivers for populations of spawning salmon and seatrout. With regard to flooding and erosion in section 5.20.1 refers to the 2016 National Strategy on Sea Defences and Coastal Erosion Evidence report which identified areas at risk of fluvial, surface water and coastal flooding within this, Laxey, amongst other areas was identified "as being at high risk both now and in the future and require urgent consideration, further investigation and potential intervention to reduce the evident risk". Section 5.20.2 notes the impact of flooding, weather and the flood risk when allocating land for future development and "flood risk acting as a critical constraint in the Site Assessment Framework used to assess proposed sites". Section 5.20.3 identifies that Flood risk maps have been produced by the MUA and their data used to identify flood risk areas. - 3.3 Natural Environment Recommendation 3
3.11 Environment Policy 7 Development which would cause demonstrable harm to a watercourse, wetland, pond or dub, and which could not be overcome by mitigation measures will not be permitted. Where development is proposed which would affect a watercourse, planning applications must comply with the following criteria:
3.12 Environment Policy 22 Development will not be permitted where it would unacceptably harm the environment and/or the amenity of nearby properties in terms of: i) pollution of sea, surface water or groundwater; ii) emissions of airborne pollutants; and iii) vibration, odour, noise or light pollution. - 3.13 Environmental Policy 35 Within Conservation Areas, the Department will permit only development which would preserve or enhance the character or appearance of the Area, and will ensure that the special features contributing to the character and quality are protected against inappropriate development. - 3.14 Other material Considerations;
4.0 PLANNING HISTORY - 4.1 It is pertinent to consider previous approved planning applications to Laxey River and flood defences: - 4.2 20/01385/B - Construction of reinforced concrete wall with stone cladding for the purpose of providing flood protection. This Section of wall ran from the Laxey Woollen Mill to No.4 Victoria Terrace. - 4.3 21/00298/B - Construction of flood protection walls. This section of walling runs from rear of 4 Victoria Terrace and extends down the river for approx. 240m to the rear of Figtree cottage. - 4.4 21/00300/B - Alterations to substructure of existing weir and re-grading of river channel incorporating a rock ramp to control flow and stabilisation of existing river banks. This section was to the north of Victoria Terrace on Glen Road Laxey. - 4.5 21/00875/B - Construction of reinforced concrete wall with stone cladding, blockwork rendered masonry walls and soil embankments for the purpose of providing flood protection. 'Amulree' and Adjacent Car Park, Tennis And Basketball Courts, Glen Road. Laxey. APPROVED.
5.0 REPRESENTATIONS (in brief, full statements can be read online) STATUTORY CONSULATIONS
5.1 Garff Parish Commissioners commented (12/10/21 & 01/11/21) on the proposals visual impact and appropriateness for the Conservation Area, Following liaison with the Commissioners, they seek to approve the application subject to a condition in place that details the final design of the wall and agreed prior to implementation. - 5.2 Highways Services have commented (06/10/21) and do not object.
5.3 DEFA Inland Fisheries have commented (14/10/21) any works to the watercourse bank and channel are restricted to a period July to September (inclusive) to avoid spawning fish. Also, the works will need to be carried out in accordance with an agreed method statement, in advance of works starting to minimise disturbance to fish within the river. - 5.4 DEFA Ecosystem policy officer commented (20/10/21) on the Statement of Case, and the commissioned Ecological Impact Assessment, that has been discussed with the applicant (DOI). They do not believe an EIA is required for these works and would be in line with the method statements agreed with Inland fisheries. - 5.5 DoI Flood risk management (04/10/21) Do not oppose. NEIGHBOURING COMMENTS
5.5 2 Glen View, South Cape commented (31/10/21) on the commissioners comments, the appropriateness of concrete material is not fitting for a Conservation Area that is dominated by Manx Stone, Unscaled drawings in the statement of case (full scaled plans are available online) Designers have ignored the west of the site that will continue to flood by the construction of the bund and ramp. - 6.0 ASSESSMENT
6.1 The fundamental issues to consider in the assessment of this planning application are;
6.2 Justification The starting point is the recommendations that were derived from the Arup report which has enabled JBA consulting to carry out surface water modelling and identify flood risk reduction opportunities possible within the Laxey Area. Of the 50 options for river, tidal and surface water flood risk alleviation, one of the options and the subject of this application is a new retaining wall between the Laxey River and Glen Road. This is further emphasised in the latest report (Laxey Flood Alleviation Scheme Feasibility Study 2020) at paragraph 6.1 titled; Long list of options - Fluvial and tidal referenced; (noted below in 6.3) This is also featured in paragraph
6.3 There is a wider government initiative to progress mitigating measures to offset flooding under the 'Programme for Government for a Sustainable Island' where it says; " Continue to invest in sea defences and in reducing flooding and coastal erosion risks for those areas identified as high risk in our national strategy". Laxey River has been identified as being high risk and the requirement for these works has been identified within the latest report from JBA consulting and previous studies, as noted above, which has been sufficiently documented and justified. Of all the works shortlisted, and the subject of this application, are seen as one of the most fundamental aspects to implement the necessary safeguards. As such the department is satisfied there is sufficient need for the principle of the works and as no evidence or conflicting professional hydrological reports to the contrary are published, the application would be in accordance with Environment Policy 7 (a,b). - 6.4 Neighbours The scope of works that would offer residents greater protection from flooding would be considered to be relatively non-contentious in the respect to the visual impacts on the neighbouring properties and would not be considered to be detrimental to their amenity. The immediate residents of Glen Road have not commented on the application, possibly as they are
7.1 The application has been considered and on balance would be appropriate for the area and would not harm the use and enjoyment of neighbouring properties or considered to harm the watercourse or that of the Laxey Conservation area has been designed to comply with Strategic Policy 4, General Policy 2 and Environment Policy 7, 22 and 35 of the Strategic Plan 2016, and is recommended for approval. - 8.0 INTERESTED PERSON STATUS
8.1 By virtue of the Town and Country Planning (Development Procedure) Order 2019, the following persons are automatically interested persons:
I can confirm that this decision has been made by the Planning Committee in accordance with the authority afforded to the it by the appropriate DEFA Delegation and that in making this decision the Committee has agreed the recommendation in relation to who should be afforded Interested Person Status.
Decision Made : Permitted Committee Meeting Date: 14.03.2022
Signed : S BUTLER Presenting Officer
Further to the decision of the Committee an additional report/condition reason was required (included as supplemental paragraph to the officer report).
Signatory to delete as appropriate YES/NO See below
Customer note
This copy of the officer report reflects the content of the file copy and has been produced in this form for the benefit of our online services/customers and archive records.
Application No. : 21/01102/B Applicant : Department Of Infrastructure Proposal : Strengthening of the existing river wall and construction of a glass flood wall along the edge of the river to provide flood protection Site Address : Shore Hotel River Wall Glen Road Laxey IM4 7DA
Senior Planning Officer : Mr Jason Singleton Presenting Officer Mr Steve Butler
Addendum to the Officer’s Report
The committee approved the application as per the officer's updated recommendation, reflecting the additional Condition 4 (in the Pre-Amble to the report to the meeting on 14.03.22) and the additional condition re: approval of stone, as per the verbal update during the meeting.
The additional condition reads: C 5. Prior to the commencement of the development hereby approved, details of the stone cladding to be used (including materials and method of installation) shall be submitted to and approved in writing by the Department. The development shall be undertaken in accordance with the approved details. Reason: In the interest of visual amenity of the Conservation Area.