Loading document...
==== PAGE 1 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Mr & Mrs Roy Cleator Ballamenagh Farm Jurby Road Sandygate IM7 3AG TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure) Order 2019 In pursuance of powers granted under the above Act and Order the Department of Environment, Food and Agriculture determined to APPROVE an application by Mr & Mrs Roy Cleator, Ref 21/00408/B, for the Variation of conditions 1 & 2 of PA 18/00763/A, Approval in principle for the construction of five dwellings addressing means of access, to extend the period of permission by two years at Part Of Field 214287 The Threshold Jurby Isle Of Man . Any conditions or notes which apply to the approval are set out below. This approval is subject to compliance with any conditions listed and may not be implemented until it becomes final (see guidance notes). 1. The development hereby approved shall be begun either before the expiration of four years from the date of this approval or before the expiration of two years from the date of approval of the last of the reserved matters. Reason: To comply with article 26 of the Town and Country Planning (Development Procedure) Order 2019 2. Approval of the details of siting, design, external appearance of the building[s], internal layout, landscaping of the site (hereinafter called "the reserved matters") shall be obtained from the Department in writing before any development is commenced. Reason: To comply with the Town and Country Planning (Development Procedure) Order 2019. 3. The visibility splay at the new access onto the new estate road identified on R01/001d shall be constructed in accordance with the approved plans and thereafter kept permanently clear of any obstruction exceeding 1050mm in height above adjoining carriageway level. Reason: In the interests of highway safety. 4. Any Reserved Matters Application should include a method statement detailing how any lizards would be protected during the works to ensure the lizards are not damaged, including a timetable for their implementation. The development shall not be carried out unless in accordance with the approved details.
==== PAGE 2 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Reason: To provide adequate safeguards for the ecological species existing on the site. 5. No development may commence until a scheme to improve water pressure/water for firefighting provision for Jurby has been completed and written confirmation has been agreed with the Department. Reason: to ensure there is adequate water for firefighting purposes. This approval relates to the submitted documents and drawings R01/001d, R01/SK05 and ITB14591-GA-001 received on 30th March 2021. This decision has been made for the following reasons(s) The proposal would have no significant impacts upon private or public amenities and comply with the relevant planning policies of the Isle Of Man Strategic Plan and the Isle Of Man Development Order 1982. Date of Issue: 7th January 2022 Director of Planning and Building Control
==== PAGE 3 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Guidance Note This decision was made by the Director of Planning and Building Control in accordance with the authority delegated to them. This decision refers only to that applied for under the Town and Country Planning Act 1999 and its subordinate legislation. A copy of the Officer’s report and any correspondence which led to the assessment and decision is available to view on the Government’s website (via Online Services www.gov.im/Viewapplications) or at the Department’s offices Murray House, Mount Havelock, Douglas. Implementation The decision does not become final until either · Any appeal has been concluded; or · 21 days have passed since the date on this notice and no appeal has been submitted Development must progress in accordance with the plans approved under, and any conditions attached to this approval (irrespective of any changes that may separately be requested at the Building Control stage or by any other Statutory Authority). This approval does not remove the need to also comply with any other relevant legislation. Any conditions requiring certain works, submissions etc. prior to commencement of development must be fulfilled prior to work starting on site. Failure to adhere to this approval and meet the requirements of all conditions may invalidate this approval or result in formal enforcement action. Appeal Any appeal must be in writing and submitted to the Department within 21 days of the date of this Notice. The appeal must contain: · the grounds for making the appeal; · payment of the planning appeal fee (currently £295); and · if relevant, confirmation that the appellant wishes to have the appeal determined by means of an inquiry and payment of the additional inquiry fee (currently £110). Where the appeal is submitted by the applicant they must: · specify in detail and by reference to material planning considerations the reasons why the appellant disagrees with that determination; and · Where against a refusal, on the grounds of deficient detail or supporting documentation, set out why they consider the information or documentation forming part of the application was sufficient in the circumstance. If the appeal is submitted by someone who has interested Person Status but is not listed in Article 4(2) of the Development Procedure Order 2019, that person must relate their grounds for making the appeal to issues which they included in representations made prior to the application being determined. Failure to meet all of the relevant above requirements will mean that the appeal cannot be validated. An appeal form and more detailed guidance are available either from Planning & Building Control, Tel 685950, or from the Department’s website www.gov.im/planningappeal If this decision becomes final because there is no appeal, the Department’s public reference copy (counter copy) of the planning application may be collected by the applicant or their agent from Murray House. Please note that if the counter copy of the application is not collected within thirty days following the last date on which a planning appeal can be made it will be destroyed without further notice.
Copyright in submitted documents remains with their authors. Request removal