Planning Approval Decision Notice
Isle of Man Town and Country Planning Act 1999
The Town and Country Planning (Development Procedure) Order 2005
Samson Designs Mr S T Samson The Workshop Park Road Port St Mary
In pursuance of powers granted under the above Act and Order the Department of Local Government and the Environment does hereby APPROVE the following application made on behalf of:
Name: Mr & Mrs J Faulkner Proposal: Renovation of existing two storey dwelling and outbuilding, construction of a two storey extension and single storey garden room extension and modifications to improve the visibility from the existing vehicular access (Re-submission of 05/01671) at: Ballahig Foxdale Road The Hope St Johns Isle Of Man IM4 3AU
which was considered on 22 May 2006, subject to compliance with the conditions specified below.
Date of Issue: 25th May, 2006 Murray House Mount Havelock Douglas
Secretary Planning Committee
Schedule Of Conditions:
- The development hereby permitted shall commence before the expiration of four years from the date of this notice.
- This permission relates to the alterations and extensions shown in drawings reference 0502/01, -/02, -/03A and -/04A all received on 2nd March, 2006.
- The external finishes of the extension must match those of the existing building in all respects.
- No other works may commence on site until such times as the visibility splay is constructed to the satisfaction of the Planning Authority after consultation with the Highway Authority.
NOTE For single connections to a water main (i.e. a single dwelling) the applicant should contact Isle of Man Water Authority Customer Services, telephone 695949.
This decision was made by the Director of Planning and Building control in accordance with the authority delegated to him under Article 3(13) of the Town and Country (Development Procedure) Order 2005
This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.
Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.
A form and guidance notes are available from either the Planning Office, Tel 685950, or to down load from the Department’s website www.gov.im/dlge/planning/plan
You should note that a copy of the Officer’s report which led to the decision being made, along with any correspondence relative to the application, is available for inspection at the Department.
The proposed development must not be commenced until either;
- The time for requesting an appeal has expired; or
- Any appeal has been determined;
Whichever is the later.