Loading document...
Application No.: 21/01135/B Applicant: Mr & Mrs Gavin Smith Proposal: Erection of a first floor extension with associated balcony Site Address: White Strand House Knocksharry Road Lhergydhoo Peel Isle Of Man IM5 2AE Planning Officer: Mrs Vanessa Porter Expected Decision Level: Officer Delegation Recommended Decision: Permitted Date of Recommendation: 23.11.2021 _________________________________________________________________
C : Conditions for approval N : Notes attached to conditions C 1. The development hereby approved shall be begun before the expiration of four years from the date of this decision notice.
Reason: To comply with Article 26 of the Town and Country Planning (Development Procedure) Order 2019 and to avoid the accumulation of unimplemented planning approvals.
This application has been recommended for approval for the following reason. The proposal complies with Housing Policy 16 of the Isle of Man Strategic Plan 2016
Plans/Drawings/Information; This decision relates to the following plans and drawings, date stamped received on 23rd September 2021:
None _____________________________________________________________________________
Officer’s Report THE APPLICATION SITE
1.1 The application site is the residential curtilage of White Strand House, Knocksharry Road, Lhergydhoo, Peel which is a two storey property with rooms in the attic space. THE PROPOSAL - 2.1 The current planning application seeks approval erect a second storey extension on top of an already existing flat roofed rear extension to create additional living accommodation. The proposed extension roof will be part flat roofed and part pitched with a balcony to the North and West.
2.2 There is also the installation of double doors to the ground floor front elevation. PLANNING HISTORY - 3.1 The previous planning applications are not relevant to the assessment of this application. PLANNING POLICY - 4.1 The site lies within an area zoned "not for development" and an "area of high landscape or coastal value and scenic significance," on the 1982 Development Plan, South Plan. The property is not within a Conservation Area nor a Flood Risk Zone.
4.2 In terms of the Isle of Man Strategic Plan there are a number of relevant policies including Strategic Policy 1 & 5 which seek to make the best use of existing developed sites and to ensure that new development is of good design, Spatial Policy 5, General Policy 3 and Environment Policy 1 which all seek to protect the countryside from unwarranted development and in this specific case the most relevant strategic policy is Housing Policy 16 which states that development of non-traditional properties will not increase the overall impact of the dwelling when viewed by the public. - 4.3 The recently released Residential Design Guidance 2021 whilst more for houses within existing settlements is a material consideration particularly those parts in respect of good neighbourliness and overlooking. - 4.4 Furthermore consideration shall also be given to Community Policies 7 and 11 in respect of reducing outbreak of fire and preventing criminal activity and Infrastructure Policy 5 in respect of water conservation.
REPRESENTATIONS
5.1 The following representations can be found in full online;
5.2 Highway Services have considered the proposal and state "No Highways Interest." (06.10.21) - 5.3 German Parish Commissioner have written in to object to the proposal on the basis that the size is out of place and will dwarf any properties around it, making the visual impact unsatisfactory to the neighbouring houses. (7.10.21)
6.1 The main issues to consider in the assessment of this planning application are:
I can confirm that this decision has been made by the Head of Development Management in accordance with the authority afforded to that Officer by the appropriate DEFA Delegation and that in making this decision the Officer has agreed the recommendation in relation to who should be afforded Interested Person Status
Decision Made : Permitted Date : 24.11.2021 Determining officer
Signed : S BUTLER Stephen Butler Head of Development Management
Copyright in submitted documents remains with their authors. Request removal
View as Markdown