8 February 2006 · Director of Planning and Building Control (M. I. McCauley)
18, Poachers Pocket, Ballasalla, Isle Of Man, IM9 3dd
The proposal is for a bungalow on an undeveloped plot in a new residential estate approved under PA 02/0712/B after a public inquiry and appeal. The design matches the previously approved footprint with rooflights and glazing in the roof slopes that do not cause overlooking.
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The officer assessed the proposal against the approved layout from PA 02/0712/B, noting the bungalow uses the identical footprint and includes rooflights and rear roof glazing that 'would not enable o…
Time limit
The development hereby permitted shall commence before the expiration of four years from the date of this notice.
Approved plans
This permission relates to the erection of a dwelling as shown in drawing reference 0210/PL1018 received on 11th November, 2005.
Sewer connection
The proposed development must be connected to the proposed sewers approved under PA 02/0712 and in a manner acceptable to the Department of Transports Drainage Division and on terms and conditions which must be agreed with the Division PRIOR to the commencement of any building works. (In particular the Drainage Division must be advised of the commencement of work on site. All drainage works must conform to the requirements of the WRc's 'Sewers for Adoption' [5th Edition] and all necessary inspections/surveys [including CCTV] are to be carried out at the developer's expense. It is also a legal requirement under the Sewerage Act 1999 that the Department of Transport (as the Drainage Authority) be advised in advance, of the date of connections of each dwelling to the public sewer. Note: Communication fees will be payable to the Department of Transport in respect of these drainage connection(s). Note: The Drainage Division requires 'as built' drawings of the development once it has been completed.
No surface water to foul sewer
There must be no discharge of surface water to the main foul sewer.
Sewer diversion
The proposed diversion of the existing public sewers which cross the site, must be carried out in terms and conditions which must be agreed with the Drainage Division prior to the commencement of any works. All drainage works must conform to the requirements of the WRc's 'Sewers for Adoption' [5th Edition] and all necessary inspections/surveys [including CCTV] are to be carried out at the developer's expense. The Drainage Division must be given three days' notice before such inspection is required.
River designation extension
No development, including site clearance shall take place in pursuance of the consent hereby granted until such times as the main river designation of the Silverburn River pursuant to the provisions of the Land Drainage Acts has been extended to incorporate the flood alleviation and mitigation measures shown on URS Drawings 47445-006-787 Figures 5, 6, 7, 8 and 11 (submitted in respect of PA 02/0712) to the satisfaction of the Planning Authority in consultation with the Department of Transport.
Flood protection bund prior to building
Following the clearance of the site and prior to the commencement of any building works, the bund, flood protection and flood alleviation and mitigation measures specified in conditions 2 and 6 (of PA 02/0712) must be constructed on site to the satisfaction of the Planning Authority.
Estate road junction prior to works
No other work shall be commenced on site until the estate road junction with the A7 adopted highway, including visibility splays where required, has been set out and established to the satisfaction of the Planning Authority after consultation with the Highway Authority.
Estate road to base course before occupation
The dwelling hereby approved may not be occupied until the estate road has been constructed to at least base course level, adequately lit from the junction of the A7 adopted highway up to the access to the dwelling to the satisfaction of the Planning Authority after consultation with the Highway Authority.
Parking before occupation
Prior to the occupation of the dwelling hereby approved, the proposed parking facilities associated with the dwelling must be provided in accordance with the approved drawing to the satisfaction of the Planning Authority and so shall thereafter be retained.
No permitted development
Notwithstanding the provisions of the Town and Country Planning (Permitted Development) Order 2005 (or any Order revoking or re-enacting that Order) no extensions, greenhouses, walls, gates, fences, garden sheds, summerhouses, flag poles, decking, garages, or tanks for the storage of oil for domestic heating shall be erected (other than those expressly authorised by this approval.)
Tree protection
Prior to the commencement of works on site, including site clearance, those existing trees on site whose removal was not authorised by the approval granted in respect of PA 02/0712, must be adequately protected against damage during the course of construction, in accordance with the recommendations contained in BS 5837 (Section 8). The area between the trunk of each tree and the fencing shall thereafter be referred to as the Protected Area. After the completion of the development works the Protected Area must remain free from excavation or the deposit of materials.
Estate road complete for penultimate dwelling
No works may commence upon the penultimate dwelling on the site until the estate road has been completed to the satisfaction of the Planning Authority after consultation with the Highway Authority.
Landscaping scheme
No development may commence until there has been approved by the Planning Authority a scheme of landscaping which includes an indication of all existing trees and hedges within the site and details of any to be retained together with measures for their protection during the course of construction.
Archaeology notification
The Manx Museum and National Trust must be informed of the date when building work is to commence and be given access at all reasonable times, and reasonable opportunity to inspect the site, observe all excavations and investigate any archaeological features exposed.
Pre-commencement site meeting
Prior to the commencement of development the applicant/developer shall convene a site meeting with the contractor and relevant officers of the DLGE and other Government Departments to agree how the works are to be undertaken in accordance with the approved plans and conditions.
Flood protection details
Prior to the commencement of any building works, further details including where appropriate, the precise location, construction, elevation and cross sectional details of the proposed flood protection bund and wall and surface water attenuation tank must be submitted to and approved by the Planning Authority.
Development within site boundary
No development associated with the proposed dwelling (including guttering and foundations) may be carried out on, over or under land which is not part of the defined site.
no adverse traffic impacts
no objection subject to conditions on sewer connections, no surface water to foul sewer, and inclusion of flood mitigation from PA 02/0712/B
recommends mains wired interconnected smoke detectors
no objection, note on water connection required