Following consideration of the below applications, I can advise that Douglas Corporation have no objection to the proposals listed below.
It should be noted that the above comments are made in relation to the Town and Country Planning Acts and does not imply approval or consent under any other relevant enactment, byelaw, order or regulation.
05/92172/B Installation of a uPVC door to replace existing, 113 Castlemona Avenue 05/92176/B Erection of a first floor extension over existing garage to side of, 12 The Laurels 05/92181/B Conversion of lower floor level to form a self contained apartment, 18 Hutchinson Square
05/92193/GB Installation of timber sliding sash windows to replace existing uPVC windows on second floor front elevation (in association with 05/92193CON), Erin Brae Queens Promenade
05/92193/CO Installation of timber sliding sash windows to replace existing uPVC windows on N * See Below second floor front elevation(in association with 05/92193GB), Erin Brae Queens Promenade
Yours faithfully
N J KAIGHIN BUILDING CONTROL MANAGER