22 December 2005 · Planning Committee
Site Supply Phase 5, Isle Of Man Business Park, Douglas, Isle Of Man, IM2 2qx
The proposal involves constructing 41 residential dwellings (including affordable units), two office buildings totalling approximately 1394 sq m net floorspace, and seven light industrial/storage and distribution units totalling approximately 1068 sq m net floorspace, along with associated infrastructure including road…
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The officer assessed the proposal against the Braddan Plan, which designated the site as part of the Business Park requiring a masterplan for mixed uses including industrial, science-based industries,…
Time limit
The development hereby permitted shall commence before the expiration of four years from the date of this notice.
Approved plans
This approval relates to drawing no.s: [list of specific drawings date stamped 2nd September 2005].
Landscaping scheme
Prior to the commencement of development a landscaping scheme for the development must be submitted to and agreed by the Planning Authority. This scheme must specifically include details of the finished levels of the earth bank along its length, the planting on and around the earth bank, and the use of hostile planting so as to deter unauthorised access and prevent areas from being used as potential hiding places. The earth bank must be constructed and planted in accordance with the agreed scheme prior to the occupation of any of the development created by this approval.
Planting and replacement
With the exception of the construction and planting of the earth bank, which is controlled under condition no. 3, all planting, seeding or turfing comprised in the agreed landscaping scheme must be carried out in the first planting and seeding seasons following the completion of the development or the occupation of any of the development created by this approval. Any trees or plants that within a period of five years from the completion of the development die, are removed, or become seriously damaged or diseased must be replaced in the next planting season with others of a similar size or species.
Re-orientation of plots 21-30
Prior to the commencement of development detailed drawings showing the re-orientation of the area and dwellings contained on plots 21 to 30 (inclusive), as shown on drawing no. 2296.15 rev. A date stamped the 2nd September 2005, must be submitted to and agreed by the Planning Authority. Such details must include proposed fencing and bin storage measures.
Estate road junction
No other works shall be commenced on site until the estate road junction with the adopted highway, including where required visibility splays, has been set out and established to the satisfaction of the Planning Authority in consultation with the Highway Authority.
Estate road construction
No dwelling shall be occupied until the estate road has been constructed to at least base course level and adequately lit from the junction with the adopted highway up to the access to the dwellings to the satisfaction of the Planning Authority in consultation with the Highway Authority.
Parking and access
No dwelling shall be occupied until the parking facilities and vehicular access(es) have/has been completed to the satisfaction of the Planning Authority in consultation with the Highway Authority before being brought into use, and such facilities shall thereafter be so retained.
Penultimate dwelling road completion
No works shall be commenced on the penultimate dwelling on the application site until the estate road has been completed to the satisfaction of the Planning Authority in consultation with the Highway Authority.
Foul sewer connection
The development must be connected to the main foul sewer.
approved
no adverse traffic impacts subject to conditions
no objection