Highways Division Consultation Response
Department of Transport
Rheynn Arraghey Director of Highways B W Hannay, B.Sc.(Hons), M Sc,C. Eng., MICE FIHT, CMILT, C Dip.A.F.
Highways Division Network Planning Sea Terminal Building Douglas, Isle of Man IM1 2RF
Switchboard (01624) 686600 Telephone (01624) 686643 Fax (01624) 686905 Email: [email protected]
RECEIVED ON 19 AUG 2005 DEPT OF LOCAL GOVERNMENT AND THE ENVIRONMENT
Date: 15th August 2005
ARRANGHEY
Dear Sir
PA05/01227/B โ Erection of a extension to provide a kitchen Thie ny Garee, Handleys Corner, Kirk Michael
The above mentioned application has been considered by the Network Planning Section and the following observations will be forwarded to the Planning Committee of the Department of Local Government and the Environment as the response of the Director of Highways on behalf of the DOT Highways Client Group.
No adverse traffic impacts.
NB: The visibility from the existing driveway to the adopted highway is inadequate to serve the needs of the existing traffic. Advice on this matter is available from the Department of Transport.
Yours faithfully
D. Sewell
D SEWELL Network Planning & Schemes Engineer
It should be noted that these observations relate only to matters affecting the highway and do not in any way prejudice any decisions which may be reached in relation to Town and Country Planning or Bye-Laws.
cc The Secretary to the Planning Committee