DOT Highways Response
Isle of Man
Government Beitigs Eilen Vennin Kinrade Associates (Building Design) 4 Market Place East Ramsey ISLE OF MAN IM8 1JY
Department of Transport
Rheynn Arraghey Director of Highways B W Hannay, B.Sc.(Hons), M Sc,C. Eng., MICE MIHT,C Dip.A.F.
Highways Division Network Planning Sea Terminal Building Douglas, Isle of Man IM1 2RF Switchboard (01624) 686600 Telephone (01624) 686680 Fax (01624) 686920 Email: [email protected].
Date: 16 December 2003
Dear Sir PA03/01805/A-Approval in principle for erection of dwelling- land forming part of Mill Kent. Bridge Road, Ballasalla
The above mentioned application has been considered by the Network Planning Section and the following observations will be forwarded to the Planning Committee of the Department of Local Government and the Environment as the response of the Director of Highways on behalf of the DOT Highways Client Group.
No adverse traffic impacts, subject to the imposition of the following conditions:
- Parking arrangements on site shall comply with the provisions of Manx Roads 1.
- The access drive arrangements shall comprise a turning feature to permit a motor car to turn round within the site, so that the vehicle can emerge from the site in forward gear.
- Sight splays/sight lines shall be provided in compliance with Manx Roads 1.
Reason for condition(s)
- To ensure the provision of satisfactory vehicle parking facilities and in the interest of road safety.
Yours faithfully
K C ASHCROFT <br> Network Planning Engineer
It should be noted that these observations relate only to matters affecting the highway and do not in any way prejudice any decisions which may be reached in relation to Town and Country Planning or Bye-Laws.
Cc The Secretary to the Planning Committee