Safety Engineering Works โ Abandoned Mine Entries
General Method Statement
June 2003
RECEIVED ON
9 OCT 2003
DEPT. OF LOCAL GOVERNMENT AND THE ENVIRONMENT
Wardell Armstrong
DATE ISSUED: June 2003
JOB NUMBER: CA02141
Department Of Trade And Industry
Safety Engineering Works โ Abandoned Mine Entries
General Method Statement
PREPARED BY:
Richard J Gaunt Associate & Principal Mining Engineer
APPROVED BY:
Stephen C Wyatt Partner
This report has been prepared by Wardell Armstrong with all reasonable skill, care and diligence, within the terms of the Contract with the Client. The report is confidential to the Client and Wardell Armstrong accept no responsibility of whatever nature to third parties to whom this report may be made known.
No part of this document may be reproduced without the prior written approval of Wardell Armstrong.
Wardell Armstrong is a Partnership and a list of the Partners and their professional qualifications is open to inspection at our offices.
Wardell Armstrong is a member of the Wardell Armstrong Consulting Group which comprises Wardell Armstrong, Wardell Armstrong China Limited, Wardell Armstrong Laird Menzies Limited, CSMA Consultants Limited, Head Office: Newcastle-under-Lyme, Other Offices: Camborne, Cardiff, Edinburgh, Hong Kong, Leigh, London, Newcastle upon Tyne, Sheffield, West Bromwich.
Contents
INTRODUCTION ..... $1-2$
1.1 Background 1.2 Outline of Proposed Works
DESCRIPTION OF THE PROPOSED ENGINEERING WORKS - MINE SHAFTS ..... $3-6$
2.1 Introduction 2.2 Excavations 2.3 Construction of Concrete Cap or Plug 2.4 Backfilling Operations and Reinstatement 2.5 Fencing
DESCRIPTION OF THE PROPOSED ENGINEERING WORKS - MINE ADITS ..... $7-8$
3.1 Introduction 3.2 Measurements and Preparation 3.3 Installation of Grille/Gates 3.4 Installation of Stone, Brick or Blockwork Seal 3.5 Access Provisions 3.6 Warning Signs and Reinstatement
SITE MANAGEMENT AND CONTROL ..... $9-15$
4.1 General 4.2 Site Supervision and Management 4.3 Duration of the Works 4.4 Hours of Work 4.5 Site Access 4.6 Water and Electricity 4.7 Fencing and Security 4.8 Protection of Existing Buildings and Services 4.9 Photographic Record 4.10 Environmental Management 4.11 Reinstatement of Sites 4.12 Health and Safety 4.13 Notices to Landowners and Other Bodies