Loading document...
==== PAGE 1 ====
Proposed Dwelling GFL 100.00 Site Plan scale 1:200 101 100 TYP D D D * Substation Hedge Shed Footpath Paving N Wooden Fence 43m 43m To Sulby To Ramsey Visibility Splay Visibility Splay Existing Entrance widened from 2.8m to 4.5m.Existing hedge to be removed. Existing walls either side of extrance are and are to remain less than 1m.Visibility of 43m minimium to be maintained for a 2.5m setback from kerb. Parking &Turning Existing Entrance Remove Existing Hedge retain wall (under 1m high) Existing Fence (1.8 m high) Existing Fence line Existing Wall Under 1m high Lawn Lawn 70m Existing Dwelling T2 T3 T1 Existing Tree (T1) to be Retained. 20m 8 Carrick Park Sulby Isle Of Man IM7 2EX 7 Carrick Park Sulby Isle Of Man IM7 2EX Dormer Window 20m Extension as Approved PA 19/01279/B Window Window aspect aspect 6m Existing Garage Existing shed T4 Existing Tree (T4) to be Removed Boundary Existing boundary wall to be retained & repaired as necessay following construction Existing boundary wall to be retained & repaired as necessay following construction Note: Figured dimensions to be used in preference to scaled dimensions. Where applicable contractor to check all dimensions on site. The copyright of this drawing is the property of Construction Design Ltd. This drawing may not be reproduced or altered without their permission Drawn By Date Title Address Drawing No. Scale Rev. Client Project Barry Murphy 4990,89 A1 Print Barry Murphy MCIAT Chartered Architectural Technologist Architectural Services for Domestic & Commercial Projects Office: 01624 623843 Mobile: 07624 460029 E-mail: [email protected] 2nd Floor, 17 Peel Road, Douglas, Isle of Man, IM1 4LP Construction Design Ltd 7 Fy Yerrey Ballanoa Glion Derwent Braes Mill View 8 Hotel Riders Retreat 41 LB The Shop B 8 26 6 Sulby Bridge 2 A 17 Edge Ginger Cottage CARRICK PARK 38 Riverside 34 East View 4 134327 Ballahowin 22 14.6m Waters El Sub Sta 3 Hill View 5 Proposed NewTree New Trees: To be native and inaccordance with guidance given in Planning Circular 1-93 consisting of a mix of:Ash, Alder,Birch, Cherry & Maple etc as appropriate for the soil conditions & subject to further expect advice. View of Existing Dwelling & Entrance View of Existing Dwelling - Front View of Existing Dwelling - Front View of Existing Dwelling - Rear View from Existing Entrance towards Sulby View from Existing Entrance towards Ramsey Existing Tree to be Retained Site MD Racing Replacement of Existing Dwelling East View, Sulby Bridge, Sulby Isle Of Man IM7 2EU Site & Location Plans as Proposed 1:200 & 1:1250 30th Nov 2020 991-001 Existing Tree to be Removed. To be removed with agreeemnt of & on behalf of neighbour subject to felling licence. Deemed to be causing damage to existing buildings & drainage. D A Site Boundary altered Dwelling size reduced Dwelling position altered 15-02-21 BM B Site dimensions amended 16-02-21 BM Site Location Plan scale 1:1250 C House position on site altered 23-04-21 BM Tree Protection Fencing: Extract from BS5837:2012 Temporary Protective fencing to BS 5837:2012 as illustrated above to be installed to demarcate a Construction Exclusion Zone (CEZ) positioned as shown on plan opposite. The fencing must be installed for the purpose of excluding construction activity and must be appropriate to the degree and activity of work taking place around the retained trees. The fencing must be installed prior to any demolition & construction activity and remain in place until the work is complete. All weather notices should be attached to the fencing with words such as CONSTRUCTION EXCLUSION ZONE - NO ACCESS. Under no circumstances should the fencing be moved or disassembled without prior approval. Under no circumstances are materials to be stored within the CEZ. Under no circumstances are site personnel permitted access the CEZ. Tree Protection Fencing CEZ Construction Exclusion Zone CEZ D Boundary altered to South East Tree on adjoining property retained 04-06-21 BM
Copyright in submitted documents remains with their authors. Request removal