12 November 2015 · Delegated - Director of Planning and Building Control (Michael Gallagher)
95, Ballamaddrell, Port Erin, Isle Of Man, IM9 6au
The proposal involves replacing the existing rear monopitch conservatory on a bungalow in the Ballamaddrell estate with a new one that is wider (4.3m vs 2.2m), taller (3.8m vs 2.6m), and slightly less projecting (exact distance not specified but less than existing 3.3m), including a 2.5m high wall facing the neighbour …
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The works are at the rear with no impact on the streetscene or character from public view, as other properties in the row have conservatories of varying sizes and heights.
General Policy 2
Requires development to respect site/surroundings in siting, scale, form, design; not adversely affect landscape/townscape character or local residents' amenity. Officer assessed rear extension against this, finding it acceptable due to no public view impact, screening wall mitigating neighbour amenity, and consistency with local conservatory precedents.
Time limit
The development hereby approved shall be begun before the expiration of four years from the date of this decision notice. Reason: To comply with article 14 of the Town and Country Planning (Development Procedure) (No2) Order 2013 and to avoid the accumulation of unimplemented planning approvals.
no highways implications
Port Erin Commissioners support the application; DOI Highways do not oppose.
Port Erin Commissioners
SupportThe Board of Port Erin Commissioners at their Meeting held on the 10th November 2015 considered planning application PA 15/01130/B, at which it was resolved to support the application.
DOI Highways
No ObjectionDo not oppose; DNO on 28-10-2015