Erection of a sun room extension to side elevation of dwelling, Ballawyllin Beg East Baldwin
BRADDAN
See Note 1
09/01188/B
Erection of a replacement dwelling, Kerrow Ne Cronk Bride Road (Re advertised due to amended plans received)
BRIDE
See Note 1
09/01720/B
Creation of additional off road parking and access, 7 Bray Hill
DOUGLAS
See Note 1
09/01749/B
Erection of a greenhouse and summer house, 21 Mines Road
LAXEY
See Note 1
09/01719/REM
Reserved matters application for the erection of a dwelling, Land Adjacent To Allandale Farm Ballamanagh Road Sulby
LEZAYRE
See Note 1
09/01757/B
Conversion and extension to existing detached garage to form additional ancillary living accommodation with garage, 1 Lheaney Grove
RAMSEY
See Note 1
The Authority wish to express their interest in the following planning applications, and request that a condition of planning be that the applicant must contact the Authority.
05/11/2009
Page 1 of 2
Standard Reply Notes for Planning Applications:
Notes
There are Underground Cables/Overhead Lines present in the area indicated in you Planning Application. Please contact our Network Operations Department, Manx Electricity Authority, (Tel. 687687) to discuss working practices around Cables and Overhead Lines which may be required to be diverted before any work can be carried out on site.
Contact the M.E.A. for Electrical Site Safety 5 documents, (Tel. 687766), before any work is carried out on site. All work to be carried out with reference to Health and Safety Executive Guidance Notes HS(G)47 \& GS6.
Contact the M.E.A. Planning Department (Tel. 687781), to discuss the electricity supply for this application.
If the applicant requires to connect any private generation to the M.E.A. electricity supply they must make an application to the M.E.A. as soon as possible. The implications due to the location of any such installations need early consideration and they must conform to the appropriate standards as set down for embedded generation.
Contact the M.E.A. Planning Department (Tel. 687781).
* Special Note
Please note MEA requires 24 hours unrestricted access to the cables in the Public Highway and MEA will not be liable for any loss of income caused to the applicant as a result of its statutory works.
Copyright in submitted documents remains with their authors. Request removal