29 October 2025 · Delegated - Principal Planner (A Morgan)
6, Meayll Drive, Ballakilley, Port St. Mary, Isle Of Man, IM9 5nt
The proposal involves erecting a two-storey extension measuring 3.212m by 3.038m to the south west (front) elevation, matching the height of the existing two-storey detached dwelling. It will provide a garage extension and kitchen/dining enlargement at ground floor, plus a fourth bedroom at first floor, with a pitched …
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The officer concluded the proposal complies with General Policy 2 of the Isle of Man Strategic Plan 2016 and Residential Design Guidance 2021, with a general presumption in favour of extensions under …
General Policy 2
General Policy 2 from the Isle of Man Strategic Plan 2016 sets general standards for acceptable development in residential areas. The officer assessed the two-storey extension against it alongside paragraph 8.12.1, finding a presumption in favour where no adverse impacts on neighbours or streetscene occur; the proposal passed due to alignment with building line, matching cladding, and no overdevelopment.
Residential Design Guide 2021
Provides guidance on good neighbourliness and overlooking for residential extensions. The officer specifically considered these aspects, determining no privacy loss as the extension faces a blank neighbour wall, and design integrates with the streetscene of grey-clad properties.
Community Policy 7
Requires consideration of reducing outbreak of fire. The officer noted the extension to an existing dwelling creates no new fire spread issues.
Community Policy 11
Addresses preventing criminal activity. No changes expected from the extension to an existing home.
Infrastructure Policy 5
Concerns water conservation. Proposal will not increase water usage beyond existing dwelling.
Transport Policy 7
Requires adequate parking per Appendix 7. Site retains 3 spaces (one in garage) after extension, sufficient post site visit assessment.
Time limit
The development hereby approved shall be begun before the expiration of four years from the date of this decision notice. Reason: To comply with Article 26 of the Town and Country Planning (Development Procedure) Order 2019 and to avoid the accumulation of unimplemented planning approvals.
In accordance with the Sewerage Act 1999 and Manx Utilities policy, surface water discharges into the foul or combined sewer network will not be permitted.