Loading document...
==== PAGE 1 ====
Department of Infrastructure, Planning & Building Control, Murray House, Mount Havelock, Douglas Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Hartford Homes Limited Unit 2 Middle River Douglas Isle Of Man IM2 1AL TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure)(No 2) Order 2013 In pursuance of powers granted under the above Act and Order the Department of Infrastructure determined to APPROVE an application by Hartford Homes Limited, Ref 15/00189/B, for the Erection of four detached dwellings (comprising amendments to PA 13/91392/B) at Plots 74, 75, 76A & 76B Cronk Cullyn Colby Isle Of Man subject to compliance with the following condition(s): 1. The development hereby approved shall be begun before the expiration of four years from the date of this decision notice. Reason: To comply with article 14 of the Town and Country Planning (Development Procedure) (No2) Order 2013 and to avoid the accumulation of unimplemented planning approvals. 2. All public open space and play equipment shown on the approved plans shall be provided and available for public use on or before the occupation of 50 of the dwellings within the wider estate as a whole in the area approved under PA 13/91392/B. Reason: to ensure that the public open space is available to users of the estate in accordance with the objectives of the Strategic Plan. 3. No development may commence until such times as adequate protection is afforded to the existing trees on site which are to be retained - such as that shown in drawing 04 submitted in respect of PA 13/91392/B. The protection shall not be removed until the development has been completed. The protected areas shall be kept clear of any building, plant, equipment, material debris and trenching, existing ground levels shall be maintained, and there shall be no entry into the protected areas except for approved arboricultural or landscape works. Reason: in the interests of the amenity of the area. 4. No dwelling may be occupied until such time as the parking spaces associated with it have been provided and there is a road at base course level (or better) to the dwellings and its parking spaces. Reason: in the interest of the amenities of the residents in the estate.
==== PAGE 2 ====
Department of Infrastructure, Planning & Building Control, Murray House, Mount Havelock, Douglas Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 5. All hard and soft landscaping works shall be carried out in accordance with the approved details and programme. Any trees or plants which, within a period of five years from the date of planting, die, are removed or become seriously damaged or diseased shall be replaced during the next planting season with other trees or plants or a species and size to be first approved in writing by the Planning Authority. All hard landsaping works shall be permanently retained in accordance with the approved details. Reason: in the interests of the amenities of the estate. This approval relates to drawings 39, 40, 41 and 42 all received on 20th February, 2015. Date of Issue: 25th March 2015 Director of Planning and Building Control
==== PAGE 3 ====
Department of Infrastructure, Planning & Building Control, Murray House, Mount Havelock, Douglas Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Guidance Note This decision was made by the Director of Planning and Building Control in accordance with the authority delegated to him in the name of the Minister and/or in the name and on behalf of the Department. This permission refers only to that required under the The Town and Country Planning (Development Procedure)(No 2) Order 2013. Any appeal against this decision must be in accordance with the criteria set down in that instrument. Specifically, a valid appeal must be in writing, signed by the appellant, and submitted to the Department within 21 days of the date of this Notice. To further validate the appeal it must contain: · Payment of a planning appeal fee as prescribed in an order made by the Department under Section 1(1) of the Fees and Duties Act 1989 (currently £150); · The reasons for making the appeal; and · An election to have the appeal conducted by means of an inquiry (a hearing) or by means of written representation. An appeal form and guidance notes are available from either Planning & Building Control, Tel 685950, or to download from the Department’s website http://www.gov.im/categories/planning-and-building-control/planning-development- control/planning-appeals/how-to-appeal/ The proposed development must not be commenced until either; · The time for requesting an appeal has expired; or · Any appeal has been determined; Whichever is the later. If no appeal is lodged within 21 days of the date of issue overleaf, and this decision becomes final, the Department’s public reference copy (counter copy) of the planning application may be collected by the applicant or their agent from Murray House. Whilst a copy of the Officer’s report which led to the decision is now available to view via the Departments website, link below, all other correspondence relative to the application is available for inspection at the Department. https://www.gov.im/planningapplication/services/planning/search.iom Please note that if the counter copy of the application is not collected within THIRTY DAYS following the last date on which a planning appeal can be made it will be destroyed without further notice.
Copyright in submitted documents remains with their authors. Request removal