13 February 2024 · Head of Development Management (Stephen Butler)
Stoneleigh, St. Georges Crescent, Port Erin, Isle Of Man, IM9 6hr
The application seeks to vary condition 1 of prior approval PA 19/01195/B, which had permitted side and rear extensions to the existing two-storey detached dwelling plus replacement windows, by extending the implementation time limit from 4 years to a further 4 years until 18/12/2027.
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The officer determined that no changes to planning policy have occurred since the original 2019 approval of PA 19/01195/B to warrant a different conclusion.
General Policy 2
Requires general standards for acceptable development including visual and neighbouring amenity, and energy reduction (subsections b, c, g, n). The officer confirmed the proposal accords with GP2 as no policy changes since 2019 affect the prior compliance finding on visual impact and neighbour amenity.
Strategic Policy 3 - To respect the character of our towns and villages
Promotes good design. Considered alongside unchanged policies from 2019 supporting the extension's design.
Spatial Policy 5
Promotes use of local materials and character. No issues identified in relation to the proposal's design.
Environment Policy 42
Promotes development taking account of locality in design. Applied consistently with 2019 assessment.
Housing Policy 16
Works to dwellings in the countryside. Relevant despite residential designation, with no countryside-specific issues raised.
Time limit
The development hereby approved shall be begun before the expiration of four years from the date of this decision notice. Reason: To comply with Article 26 of the Town and Country Planning (Development Procedure) Order 2019 and to avoid the accumulation of unimplemented planning approvals.
No highways interest (12/01/2024)
Highway Services HDC lists application 23/01506/B under 'no interest (NHI)' applications, indicating no highway concerns or opposition.
Highway Services HDC
No CommentHighway Services HDC has no interest (NHI) in: 23/01506/B; From the Planning List 12 January 2024 and excluding planning applications with suffix ‘CON’ and re-consultations, the following new planning applications have highway related impacts and will be subject to a separate response: 24/00001/B