16 March 2015 · Delegated - Director of Planning and Building Control
Peel Group Practice, Albany Road, Peel, Isle Of Man, IM5 1hu
The Peel Medical Centre is a recently completed two-storey building with a complex hipped roof and varied footprint, finished in sandstone-coloured masonry blockwork, roughcast render, and imitation slate tiles.
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The officer welcomed the revised scheme, noting the original flat-roofed design on the southwestern edge adjacent to the highway 'would have harmfully undermined the original design approach to the bu…
Community Policy 6
Requires new community health care facilities and extensions to not over-concentrate uses, adversely affect residential character/amenity, ensure accessibility, and avoid unacceptable highway impact. The limited size avoided conflict with (a), and it otherwise complied; no issues with character, amenity, access, or highways.
General Policy 2
Permits development respecting site/surroundings in siting, layout, scale, form, design; not adversely affecting character, amenity, access, parking, road safety, or adjoining land. The extension's matching design, scale, and location satisfied these tests, with no adverse impacts identified.
Time limit
The development hereby approved shall be begun before the expiration of four years from the date of this decision notice. Reason: To comply with article 14 of the Town and Country Planning (Development Procedure) (No2) Order 2013 and to avoid the accumulation of unimplemented planning approvals.
recommended approval on 16th January 2015 and reiterated on 23rd February 2015
offered no objection on 16th January 2015