Applicant: Department Of Infrastructure Proposal: Creation of a civic amenity site with site road and roundabout, Field 130136 & 134028 Balladoole Farm Bride Road Ramsey Isle Of Man
In accordance with paragraph 10 of the above Order, the person appointed by the Council of Ministers to consider this application has submitted his report.
In accordance with paragraph 10.3(a) and (b), a copy of the appointed persons report is enclosed.
On the 3rd March 2011, and after consultation, the Council of Ministers accepted the recommendation contained within that report and the application was approved subject to compliance with the conditions specified below.
Date of Issue: 7th March 2011
Chief Secretary's Office Government Offices Bucks Road Douglas
Mr A Johnstone Planning Appeals Administrator
The application is approved subject to conditions as listed at Annex 1 to the Inspector's Report.
Schedule Of Conditions:
- The development hereby permitted shall commence before the expiration of four years from the date of this notice.
- This approval relates to the creation of a civic amenity site with site road and roundabout as proposed in the submitted documents and plans which are date-stamped 3rd August 2010.
- A Construction Environmental Management Plan ("CEMP") for the construction phase of the site development will be produced and submitted to the Planning authority (prior to commencement of construction). Site construction shall not commence until the CEMP shall be approved in writing by the Planning Authority.
- Site clearance works relevant to existing hedges/banks shall only be undertaken between August and March to protect nesting birdlife.
5 (1) No development shall take place until full details of a landscape Scheme ("LS") are produced, submitted and approved by the Planning Authority (prior to commencement of development of anmy landscape and any visual mitigation measures); (2) All planting will be carried out in accordance with the approved details contained in the LS in the next available planting season; (3) A Schedule of Maintenance Operations will be agreed with the Planning Authority together with details of an appropriately qualified contractor relevant to any planting undertaken in accordance with the conditions 5(1) and 5(2) to ensure that the design envisaged is realised; this will include replacement and management of any planting undertaken as appropriate and required to realise the design objectives.
6 The site shall not be opened to the public for use as a civic amenity site unless and until all works necessary to secure unimpeded public access by the site road and roundabout shall have been completed.
7 The site shall be allowed to operate as a civic amenity site open to the public between the following times:-
| Monday to Thursday | 8.00am to 4.30 pm |
| Friday | 8.00am to 4.00 pm |
| Saturday | 8.00am to 4.30 pm |
| Sunday | 9.00am to 4.30 pm |
The last public access to the site shall be no later than 15 minutes before the closing time. The site shall be secured overnight.
8 A schematic diagram showing the height, position/location, direction and angle of all external lighting will be produced and submitted to the Planning Authority prior to the opening of the civic amenity site to the public.
9 Private vehicles accessing the site for the purposes of utilising the civic amenity facilities shall remain on site only for the duration of delivering and picking up materials.