24 June 2014 · Planning Committee
Plots 11, 12, 13 & 62 - Land At Ballakilley, Church Road, Port St Mary, Isle Of Man, IM9 6dt
The proposal seeks to amend the approved layout (PA 13/00777/B) within the Ballakilley residential estate by replacing six detached dwellings (oak, maple, spruce, hazel, beech, oak) with seven narrower ones, maintaining the same types but adding duplicates and a new plot 62, resulting in the same overall built frontage…
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The site is designated for residential development in the Area Plan for the South (Site 23) with an approved scheme under PA 13/00777/B for 155 dwellings, and work has commenced including a show home.…
General Policy 2
Requires development in accordance with land use zoning and Area Plan to respect site/surroundings in siting, layout, scale, form, design, landscaping; not adversely affect character, amenities, road safety, traffic, or services. Officer assessed the amendment as compliant given the site's residential designation, approved similar scheme, same frontage, unchanged spacing, and conditions ensuring access, parking, traffic calming, and landscaping.
Time limit
The development hereby approved shall be begun before the expiration of four years from the date of this decision notice. Reason: To comply with article 14 of the Town and Country Planning (Development Procedure) (No2) Order 2013 and to avoid the accumulation of unimplemented planning approvals.
Phasing compliance
The dwellings hereby approved must be constructed in accordance with the phasing programme approved as part of PA 13/00777. REASON: the overall estate has been phased to ensure the appropriate provision of public open space and highways and the development hereby approved must accord with that.
Landscaping scheme
Other than as specified in the approved phasing schedule, all planting, seeding or turfing comprised in the approved details of landscaping must be carried out in the first planting and seeding seasons following the completion of the development or the occupation of the dwellings, whichever is the sooner. Any trees or plants which within a period of five years from the completion of the development die, are removed, or become seriously damaged or diseased must be replaced in the next planting season with others of a similar size and species. REASON: it is important for the success of the development that the landscaping, which is designed to soften and complement the built development, is introduced as shown in the plans.
Access and footways
Prior to the occupation of any dwelling, there must be between the property and the A29 Church Road an access including footways constructed to at least base course level and adequately lit. NOTE: The applicant should take all reasonable steps to ensure that roads and footways are usable by those who may be occupying the completed houses whilst construction continues elsewhere on the estate. REASON: when each dwelling is occupied there must be a reasonable standard of roadway access to and from the dwelling and from the to the public highway.
Traffic calming
Prior to the occupation of any dwelling appropriate traffic calming features to ensure that traffic travels at a safe speed must be installed to the satisfaction of the Planning Authority. NOTE: this may include temporary traffic calming measures to be installed whilst the carriageways are being used by construction traffic as well as permanent features which will be retained once the roads are completed. The applicant should liaise with the Highway Authority in this respect. REASON: the estate must be safe for all users.
Parking provision
No dwelling shall be occupied until the vehicular access has been provided where shown on the approved plans and in all cases space has been laid out for at least two motor cars to be parked in accordance with the drawing 17.02 P3. These vehicle parking facilities shall thereafter be retained for use in conjunction with the relevant dwelling. REASON: this condition is imposed in order to ensure that reasonable and adequate parking space is provided to meet normal parking demands and avoid the need for vehicles to be parked on the highway where they could adversely affect the safety of other highway users.
do not oppose the application
Port Erin Commissioners, Rushen Parish Commissioners, and Highways Traffic Engineer all support or have no objections to planning application PA 14/00549/B for the erection of seven detached dwellings on Plots 8-13 at Ballakilley Site, Off Church Road, Rushen.
Port Erin Commissioners
SupportThe Board of Port Erin Commissioners at their Meeting held on the 20th May 2014 considered planning application PA 14/00549/B, at which it was resolved to support the application.
Rushen Parish Commissioners
No Objection14/00549. Ballakilley Development, Church Road, Heritage Homes Ltd. Amendment to approved plots 8 to 13 (8 & 9 are in Rushen). Erection of 7 detached dwellings instead of 6. No objections
Highway Services
No ObjectionPA 14/00549/B Erection of seven detached dwellings (amendment to approved PA 13/00777/B), Plots 8 - 13 Ballakilley (Residential Development Under Construction) Off Church Road; Do not oppose